WELL · 42-173-31781 · DISTRICT 10

Zant 47 SWD #1

WaterN

Glasscock County  · Vertical

Zant 47 Swd #1 (API 42-173-31781) is a former disposal or injection well in Glasscock County, last operated by Berry Oil Comp.; its UIC permit is no longer active.

The RRC has issued 4 drilling permits between 1985 and 2014, permitted to 10,500 ft.

Operator of record

Berry Oil Comp.

Houston, TX · P-5 Y, filed Mar 4, 2016 · 831 permits on file · (281) 840-4000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitBerry Oil Comp.Apr 30, 2014
10,500
total depth, ft
4
permits on file
Apr 30, 2014
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
782842-99ReenterBerry Oil Comp.Mar 21, 2014Apr 30, 2014—10,500
733964-99ReenterBerry Oil Comp.Feb 15, 2012Feb 27, 2012—10,500
671976-99ReenterPiedra Operating, LLCSep 26, 2008Oct 13, 2008—10,500
264101-99DrillExxon Corp.Jan 14, 1985Jan 14, 1985Feb 11, 198510,300

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Feb 2022
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000102642W-14 DisposalCanceled Oct 3, 202220,0001,8193,638–5,515

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120212022

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17331781, documented in the API reference.