WELL · 42-173-32386 · DISTRICT 8

Cooper 35 #1

Plugged

Glasscock County · Cobra (Wolfcamp) field  · Vertical

Cooper 35 #1 (API 42-173-32386) is a plugged well in Glasscock County, plugged October 13, 2001, last operated by Range Production Company.

The RRC has issued one drilling permit, issued December 3, 1993, permitted to 8,500 ft.

It was permitted by Matador Drilling Corp. and has since transferred to Range Production Company on the wellbore schedule.

Completion filings report 3 formation tops, including San Andres, Clear Fork, Wolfcamp.

Its lease has reported 915 barrels of oil and 2.94K mcf of gas since April 1994, last reporting in November 2001.

Operator of record

Range Production Company

Permitted by Matador Drilling Corp.; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Nov 6, 2015 · 1,666 permits on file · (817) 980-4254

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRange Production Company
Production reportsMDC Operating, Inc.through May 1995
Latest permitMatador Drilling Corp.Dec 3, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,500
total depth, ft
1
permits on file
Dec 3, 1993
last permit issued
Apr 1, 1994
completed
915
cumulative oil, bbl
2.94K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 1994 THROUGH Nov 2001

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 1, 1994
Shut in
—
Plugged
Oct 13, 2001

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cooper 35 O-10-34147Cobra (Wolfcamp)Range Production Company19152.94KApr 1994 – Nov 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Matador Drilling Corp.Apr 1994 → Mar 1995
  2. 2MDC Operating, Inc.Apr 1995 → May 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
418944-99DrillMatador Drilling Corp.Dec 3, 1993Dec 3, 1993Dec 13, 19938,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-34147————

Formation tops

As filed on W-2/G-1. Subsea from 2,536 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres3,150-614
Clear ForkCLEARFORK5,794-3,258
Wolfcamp8,048-5,512

Perforations

Perforated and open-hole intervals.

FromToType
8,1498,172Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
12.7535717.5400 S
8.6253,26011650 S
5.58,3467.875800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 8, 1997Mar 12, 1997—
00Jun 23, 1994Apr 28, 1994Yes
00May 13, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

543K
bbl, last 12 reported months
2.08M
bbl, all reported
Jan 2002
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000083174H-1 InjectionPlugged Nov 1, 20011,5002,8008,149–8,172

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 542,840 · prior 12 0

020K40K60K20012002

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17332386, documented in the API reference.