WELL · 42-175-30472 · DISTRICT 2

Miller-Albrecht Unit #2

Plugged

Goliad County · Mission Valley W(cook Mountain) field  · Vertical

Miller-Albrecht Unit #2 (API 42-175-30472) is a plugged well in Goliad County, plugged January 31, 2003, last operated by Harkins & Company.

The RRC has issued 2 drilling permits between 1986 and 1988, permitted to 6,000 ft.

Operator of record

Harkins & Company

Corpus Chrsti, TX · P-5 Y, filed Feb 3, 1993 · 158 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHarkins & Company
Production reportsnone
Latest permitHarkins & CompanyJul 28, 1988
6,000
total depth, ft
2
permits on file
Jul 28, 1988
last permit issued
Aug 10, 1976
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 10, 1976
Shut in
—
Plugged
Jan 31, 2003

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Miller-Albrecht G-2-128039Mission Valley, W. (Frio 2760)Dominion Expl. & Prod., Inc.100Jan 1993 – Jan 2003

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
349206-99RecompletionHarkins & CompanyJul 22, 1988Jul 28, 1988—6,000
323165-99RecompletionHarkins & CompanyNov 17, 1986Nov 25, 1986—6,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-128039————

Perforations

Perforated and open-hole intervals.

FromToType
2,7712,775Perforated
2,8122,822Perforated
2,8602,864Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7558214.75360 S
2.8755,6277.8751,290 S
10.75———
2.875———

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 12, 2001Nov 27, 2000—
00Aug 23, 1988Jul 22, 1988Yes
00Aug 20, 1988——
00May 6, 1987Apr 17, 1987Yes
00Apr 30, 1987——
00Jan 12, 1984Aug 18, 1976—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17530472, documented in the API reference.