WELL · 42-175-31872 · DISTRICT 2
Harris M.P. #3
Goliad County · Blanconia N. (4820) field · Vertical
Harris M.P. #3 (API 42-175-31872) is a plugged well in Goliad County, plugged April 13, 1996, last operated by Cherokee Production LLC.
The RRC has issued one drilling permit, issued May 11, 1984, permitted to 5,300 ft.
It was permitted by Esenjay Petroleum Corp. and has since transferred to Cherokee Production LLC on the wellbore schedule.
Completion filings report one formation top, including Vicksburg.
Its lease has reported 225K barrels of oil and 515K mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Esenjay Petroleum Corp.; the EWA schedule now lists a different operator.
Goliad, TX · P-5 Y, filed May 4, 2026 · (361) 550-5104
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cherokee Production LLC |
| Production reports | Cherokee Production LLCthrough Apr 2026 |
| Latest permit | Esenjay Petroleum Corp.May 11, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,300
- total depth, ft
- 1
- permits on file
- May 11, 1984
- last permit issued
- Jun 8, 1984
- completed
- 225K
- cumulative oil, bbl
- 515K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 8, 1984
- Shut in
- —
- Plugged
- Apr 13, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Harris, M.P. O-2-6645 | Blanconia, N. (4820) | Cherokee Production LLC | 2 | 225K | 515K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 60 · prior 12 58(+3%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Esenjay Petroleum Corp.Jan 1993 → Jul 1998
- 2Esenjay Exploration, IncAug 1998 → Aug 2002
- 3Rincon Petroleum CorporationSep 2002 → Apr 2024
- 4Cherokee Production LLCSep 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 238571-99 | Drill | Esenjay Petroleum Corp. | May 10, 1984 | May 11, 1984 | May 18, 1984 | 5,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-2-6645 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 93 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Vicksburg | 5,120 | -5,027 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,807 | 4,814 | Perforated |
| 4,814 | 4,821 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 400 | 12.25 | 160 sx |
| 4.5 | 5,207 | 7.875 | 1,030 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 30, 1984 | Jun 28, 1984 | — |
| 00 | Jul 24, 1984 | Jun 28, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-31872 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-31872 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17531872, documented in the API reference.