WELL · 42-175-31975 · DISTRICT 2

Koontz C #1

Y

Goliad County · Sarco Creek West (4700) field · Producing  · Vertical

Koontz C #1 (API 42-175-31975) is a well in Goliad County operated by Wagner Oil Company, completed January 30, 1985 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 28, 1984, permitted to 5,100 ft.

It was permitted by Txo Production Corp. and has since transferred to Wagner Oil Company on the wellbore schedule.

Completion filings report one formation top, including Frio.

Its lease has reported 146K barrels of oil and 423K mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Wagner Oil Company

Permitted by TXO Production Corp.; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Sep 4, 2025 · 278 permits on file · (800) 457-5332

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWagner Oil Company
Production reportsWagner Oil Companythrough Apr 2026
Latest permitTXO Production Corp.Dec 28, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,100
total depth, ft
1
permits on file
Dec 28, 1984
last permit issued
Jan 30, 1985
completed
146K
cumulative oil, bbl
423K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 30, 1985
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Koontz C O-2-6849Sarco Creek, West (4700)Wagner Oil Company1146K423KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 2,514 · prior 12 3,277(-23%)

0200400202420252026

Gas, mcf lease total

Last 12 months 587 · prior 12 357(+64%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bridge Oil Production Co., Inc.Jan 1993 → Jun 1993
  2. 2Bridge Oil Company, L. P.Jul 1993 → Sep 1994
  3. 3Parker & Parsley Development L.POct 1994 → Jan 1995
  4. 4Parker & Parsley Producing L.P.Feb 1995 → Oct 1997
  5. 5Pioneer Resources Producing, L.PNov 1997 → Jun 1999
  6. 6Prize Operating CompanyJul 1999 → Mar 2002
  7. 7Gruy Petroleum Management Co.Apr 2002 → Apr 2006
  8. 8Cimarex Energy Co. of ColoradoMay 2006 → Sep 2015
  9. 9Wagner Oil CompanyOct 2015 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
263035-99DrillTXO Production Corp.Dec 27, 1984Dec 28, 1984—5,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-6849————

Formation tops

As filed on W-2/G-1. Subsea from 126 ft elevation.Download CSV →

FormationMD ftSubsea
FrioTOP OF FRIO3,940-3,814

Perforations

Perforated and open-hole intervals.

FromToType
4,7424,748Perforated
4,7504,757Perforated
4,7744,779Perforated
4,7804,786Perforated
4,7884,801Perforated
—4,801Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,32712.25640 S
4.55,0787.875525 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 6, 1985Feb 13, 1985—
00Feb 23, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17531975, documented in the API reference.