WELL · 42-175-32162 · DISTRICT 2
Wendel Alonzo et UX #1
Goliad County · Reichert (Frio 3530) field · Vertical
Wendel Alonzo ET UX #1 (API 42-175-32162) is a plugged well in Goliad County, plugged August 21, 2018, last operated by Core E & P Corp..
The RRC has issued 2 drilling permits between 1986 and 1993, permitted to 4,000 ft.
It was permitted by Gastex, Inc. and has since transferred to Core E & P Corp. on the wellbore schedule.
Completion filings report one formation top, including Frio.
Operator of record
Permitted by Gastex, Inc.; the EWA schedule now lists a different operator.
Victoria, TX · P-5 Y, filed Apr 4, 2026 · 7 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Core E & P Corp. |
| Production reports | Core E & P Corp.through Aug 2002 |
| Latest permit | Gastex, Inc.Jul 2, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 2
- permits on file
- Jul 2, 1993
- last permit issued
- Jul 2, 1993
- completed
- 0
- cumulative oil, bbl
- 59.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 2, 1993
- Shut in
- —
- Plugged
- Aug 21, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wendel, Alonzo et UX G-2-146730 | Reichert (Frio 3530) | Core E & P Corp. | 1 | 0 | 57.3K | Aug 1993 – Aug 2018 |
| Wendel, Alonzo et UX G-2-123025 | Reichert (Frio 3040) | Gastex, Inc. | 1 | 0 | 2.51K | Jan 1993 – Jul 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Gastex, Inc.Feb 1993 → Feb 1995
- 2Osr Oil & Gas CompanyFeb 1996 → Feb 1996
- 3Core E & P Corp.Mar 2001 → Aug 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 413029-99 | Recompletion | Gastex, Inc. | Jun 21, 1993 | Jul 2, 1993 | Jul 2, 1993 | 3,663 |
| 305372-99 | Drill | Cambridge Oil Company | Aug 18, 1986 | Aug 18, 1986 | — | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-123025 | — | — | — | — |
| — | — G-2-146730 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 142 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,042 | 3,046 | Perforated |
| 3,538 | 3,541 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 410 | 12.25 | 149 S |
| 4.5 | 3,663 | 7.875 | 516 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 21, 1994 | Sep 1, 1993 | Yes |
| 00 | Oct 8, 1993 | — | — |
| 00 | Feb 19, 1987 | Sep 15, 1986 | Yes |
| 00 | Jan 29, 1987 | — | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-32162 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-32162 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17532162, documented in the API reference.