WELL · 42-175-32269 · DISTRICT 2
Gohlke Heirs #1
Goliad County · Poehler (Massive 8300) field · Vertical
Gohlke Heirs #1 (API 42-175-32269) is a plugged well in Goliad County, plugged May 30, 2018, last operated by Laguna Oil & Gas Corp..
The RRC has issued 2 drilling permits between 1987 and 1995, permitted to 9,000 ft.
Completion filings report 6 formation tops, including Jackson, Yegua, Cook Mountain, Cook Mtn.
Its 2 leases have reported 21.2K barrels of oil and 14.6K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Weesatche, TX · P-5 Y, filed Apr 6, 2018 · 19 permits on file · (361) 645-4898
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Laguna Oil & Gas Corp. |
| Production reports | Laguna Oil & Gas Corp.through Sep 2012 |
| Latest permit | Laguna Oil & Gas Corp.Feb 13, 1995 |
- 9,000
- total depth, ft
- 2
- permits on file
- Feb 13, 1995
- last permit issued
- Jan 20, 1988
- completed
- 21.2K
- cumulative oil, bbl
- 14.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 20, 1988
- Shut in
- —
- Plugged
- May 30, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gohlke Heirs O-2-8037 | Poehler (Cook Mt.) | Laguna Oil & Gas Corp. | 1 | 21K | 14.6K | Feb 1995 – Jul 2026 |
| Gohlke Heirs O-2-7352 | Poehler (Massive 8300) | Laguna Oil & Gas Corp. | 1 | 219 | 6 | Jan 1993 – Mar 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Laguna Oil & Gas Corp.Jan 1993 → Sep 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 432775-99 | Recompletion | Laguna Oil & Gas Corp. | Feb 10, 1995 | Feb 13, 1995 | Jan 12, 1995 | 9,000 |
| 336569-99 | Drill | Hewitt, Robert J. | Sep 28, 1987 | Sep 29, 1987 | — | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-2-7352 | — | — | — | — |
| — | — O-2-8037 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 237 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Jackson | 3,550 | -3,313 |
| Yegua | 4,660 | -4,423 |
| Cook Mountain | 5,040 | -4,803 |
| Cook MTN | 5,040 | -4,803 |
| Midway | 5,450 | -5,213 |
| Wilcox | 7,740 | -7,503 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,239 | 5,243 | Perforated |
| 8,286 | 8,294 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,743 | 12.25 | 702 S |
| 4.5 | 8,507 | 7.875 | 375 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 31, 1995 | Feb 17, 1995 | Yes |
| 00 | Mar 1, 1995 | Feb 4, 1988 | Yes |
| 00 | Apr 22, 1988 | Feb 4, 1988 | Yes |
| 00 | Mar 24, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-32269 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-32269 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17532269, documented in the API reference.