WELL · 42-175-32351 · DISTRICT 2
Chance Gas Unit #5
Goliad County · Vertical
Chance Gas Unit #5 (API 42-175-32351) is a former disposal or injection well in Goliad County, last operated by Goliad Operating Company; its UIC permit is no longer active.
The RRC has issued 2 drilling permits between 1988 and 1994, permitted to 4,200 ft.
Completion filings report 3 formation tops, including Catahoula, Frio, Vicksburg.
Operator of record
Houston, TX · P-5 Y, filed Aug 8, 2003 · 70 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Goliad Operating Companythrough Aug 1994 |
| Latest permit | Goliad Operating CompanyOct 3, 1994 |
- 4,200
- total depth, ft
- 2
- permits on file
- Oct 3, 1994
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 20.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2001
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Chance Gas Unit G-2-130139 | Alkek, North (Frio 3780) | Engroup Resources, L.P. | 1 | 0 | 20.5K | Jan 1993 – Mar 2001 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Nomeco Oil & Gas Co.Jan 1993 → Feb 1994
- 2Atasca Resources, Inc.Mar 1994 → Jul 1994
- 3Goliad Operating CompanyAug 1994 → Aug 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 426971-99 | Recompletion | Goliad Operating Company | Aug 15, 1994 | Oct 3, 1994 | — | 4,200 |
| 353261-99 | Drill | Goliad Operating Company | Nov 14, 1988 | Nov 15, 1988 | — | 4,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-130139 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 135 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,700 | 2,710 | Perforated |
| 3,778 | 3,782 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 420 | 12.75 | 165 S |
| 8.625 | 434 | 12.75 | 165 S |
| 4.5 | 4,100 | 7.875 | 660 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 23, 1997 | Apr 14, 1997 | — |
| 00 | May 12, 1997 | Apr 9, 1997 | — |
| 00 | Apr 7, 1989 | Feb 7, 1989 | Yes |
| 00 | Mar 30, 1989 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-32351 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-32351 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 11.8K
- bbl, all reported
- Nov 2000
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000084815 | W-14 Disposal | Plugged Mar 26, 2001 | 100 | 100 | 2,700–2,710 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17532351, documented in the API reference.