WELL · 42-175-32466 · DISTRICT 2

Gerhardt & Ottillia Burns #2

Plugged

Goliad County · Soleberg (Yegua) field  · Vertical

Gerhardt & Ottillia Burns #2 (API 42-175-32466) is a plugged well in Goliad County, plugged March 23, 1993, last operated by Tepco Inc..

The RRC has issued 3 drilling permits (amended once) between 1989 and 2005, permitted to 10,600 ft.

It was permitted by Forbes, C. C. Company and has since transferred to Tepco Inc. on the wellbore schedule.

It holds an active disposal or injection permit.

Operator of record

Tepco Inc.

Permitted by Forbes, C. C. Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Oct 1, 1999 · 48 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTepco Inc.
Production reportsTepco, Inc.through Jan 1993
Latest permitForbes, C. C. CompanyAug 10, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,600
total depth, ft
4
permits on file
Aug 10, 2005
last permit issued
Aug 18, 1992
completed
0
cumulative oil, bbl
36
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 18, 1992
Shut in
—
Plugged
Mar 23, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gerhardt & Ottillia Bruns G-2-224709Ric-John (3250)Texxco Energy Services Inc100Oct 2006 – Jul 2026
Bruns G-2-137658WildcatTepco, Inc.100Jan 1993 – Mar 1993
Gerhardt & Ottillia Burns G-2-143532Soleberg (Yegua)Tepco, Inc.1036Jan 1993 – Mar 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Tepco, Inc.Jan 1993 → Jan 1993

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
604754-98ReenterForbes, C. C. CompanyDec 1, 2006Aug 10, 2005Aug 5, 20064,000
604754-99ReenterForbes, C. C. CompanyAug 10, 2005Aug 10, 2005—4,000
403703-99RecompletionTepco, Inc.Oct 1, 1992Oct 12, 1992Jan 1, 19908,600
366429-99DrillIP Petroleum Company, Inc.Nov 14, 1989Nov 14, 1989Nov 29, 198910,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-137658————
—— G-2-143532————
—— G-2-224709————

Perforations

Perforated and open-hole intervals.

FromToType
3,3003,850Perforated
5,4925,512Perforated
9,8449,851Perforated
9,9069,921Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,54314.51,230 S
5.54,2006.5927 S
7.6258,9899.875540 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 3, 2007Nov 7, 2006—
00Feb 22, 2007——
00Feb 12, 1993Sep 22, 1992Yes
00Jan 13, 1993——
00Apr 30, 1991Feb 11, 1991Yes
00Apr 15, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
10.2M
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000096009H-1 InjectionActive7,5001,5253,050–3,850

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

012025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17532466, documented in the API reference.