WELL · 42-175-32546 · DISTRICT 2
Willemin Rosie #1
Goliad County · Fannin (Catahoula) field · Vertical
Willemin Rosie #1 (API 42-175-32546) is a plugged well in Goliad County, plugged August 3, 1994, last operated by CD Consulting & Operating CO..
The RRC has issued one drilling permit (amended once), issued September 5, 1990, permitted to 9,200 ft.
It was permitted by Chesnutt Oil & Gas, Inc. and has since transferred to CD Consulting & Operating CO. on the wellbore schedule.
Completion filings report 3 formation tops, including Miocene (undifferentiated), Frio, Catahoula.
Operator of record
Permitted by Chesnutt Oil & Gas, Inc.; the EWA schedule now lists a different operator.
Bridgeport, TX · P-5 Y, filed Apr 4, 2026 · 56 permits on file · (940) 393-1657
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | CD Consulting & Operating Co. |
| Production reports | CD Consulting & Operating Co.through Mar 1994 |
| Latest permit | Chesnutt Oil & Gas, Inc.Sep 5, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,200
- total depth, ft
- 2
- permits on file
- Sep 5, 1990
- last permit issued
- Sep 30, 1990
- completed
- 0
- cumulative oil, bbl
- 18.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 1994
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 30, 1990
- Shut in
- —
- Plugged
- Aug 3, 1994
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Willemin, Rosie G-2-137758 | Fannin (Catahoula) | CD Consulting & Operating Co. | 1 | 0 | 18.2K | Jan 1993 – Aug 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1CD Consulting & Operating Co.Jan 1993 → Mar 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 377560-98 | Drill | Chesnutt Oil & Gas, Inc. | Jan 22, 1991 | Sep 5, 1990 | — | 9,200 |
| 377560-99 | Drill | Chesnutt Oil & Gas, Inc. | Sep 5, 1990 | Sep 5, 1990 | Sep 8, 1990 | 2,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-137758 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 120 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 1,400 | -1,280 |
| Frio | 2,000 | -1,880 |
| Catahoula | 2,700 | -2,580 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,707 | 2,713 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 304 | 12.25 | 135 S |
| 2.875 | 2,915 | 7.875 | 665 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 26, 1991 | Jan 25, 1991 | Yes |
| 00 | Apr 25, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-32546 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-32546 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17532546, documented in the API reference.