WELL · 42-175-32694 · DISTRICT 2
Wendel Alonzo et UX #2A
Goliad County · Reichert (Frio 3040) field · Vertical
Wendel Alonzo ET UX #2A (API 42-175-32694) is a plugged well in Goliad County, plugged August 16, 2018, last operated by Core E & P Corp..
The RRC has issued one drilling permit (amended once), issued February 26, 1993, permitted to 3,650 ft.
It was permitted by Gastex, Inc. and has since transferred to Core E & P Corp. on the wellbore schedule.
Completion filings report 2 formation tops, including Miocene (undifferentiated), Frio.
Operator of record
Permitted by Gastex, Inc.; the EWA schedule now lists a different operator.
Victoria, TX · P-5 Y, filed Apr 4, 2026 · 7 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Core E & P Corp. |
| Production reports | Core E & P Corp.through Feb 2001 |
| Latest permit | Gastex, Inc.Feb 26, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,650
- total depth, ft
- 2
- permits on file
- Feb 26, 1993
- last permit issued
- Mar 20, 1993
- completed
- 0
- cumulative oil, bbl
- 310K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1993 THROUGH Aug 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 20, 1993
- Shut in
- —
- Plugged
- Aug 16, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wendel, Alonzo et UX G-2-145896 | Reichert (Frio 3040) | Core E & P Corp. | 1 | 0 | 310K | Mar 1993 – Aug 2018 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Gastex, Inc.Mar 1993 → Mar 1995
- 2Mec Energy CorporationApr 1995 → Sep 1995
- 3Osr Oil & Gas CompanyOct 1995 → May 1996
- 4West Texas Operating Company,llcJun 1996 → Jan 1999
- 5Core Energy CorporationFeb 1999 → Jun 1999
- 6Core E & P Corp.Jul 1999 → Feb 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 409406-98 | Drill | Gastex, Inc. | Jun 21, 1993 | Feb 26, 1993 | Feb 28, 1993 | 3,650 |
| 409406-99 | Drill | Gastex, Inc. | Feb 26, 1993 | Feb 26, 1993 | — | 3,650 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-145896 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 153 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 1,810 | -1,657 |
| Frio | 2,800 | -2,647 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,061 | 3,066 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 360 | — | 170 S |
| 2.875 | 3,643 | — | 470 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 14, 1993 | Jul 12, 1993 | Yes |
| 00 | Jul 27, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-32694 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-32694 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17532694, documented in the API reference.