WELL · 42-175-32724 · DISTRICT 2
Ray George #7
Goliad County · Pettus E. (a-1 Wilcox) field · Directional
Ray George #7 (API 42-175-32724) is a plugged well in Goliad County, plugged September 26, 1997, last operated by Okla. Magic Circle Energy Corp..
The RRC has issued one drilling permit (amended once), issued August 30, 1993, permitted to 8,400 ft.
It was permitted by Christico Petroleum Company and has since transferred to Okla. Magic Circle Energy Corp. on the wellbore schedule.
Completion filings report 3 formation tops, including Frio, Vicksburg, Pettus.
Operator of record
Okla. Magic Circle Energy Corp.
Permitted by Christico Petroleum Company; the EWA schedule now lists a different operator.
Shawnee, OK · P-5 Y, filed Apr 7, 2006
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Okla. Magic Circle Energy Corp. |
| Production reports | Christico Petroleum Companythrough Jun 1994 |
| Latest permit | Christico Petroleum CompanyAug 30, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,400
- total depth, ft
- 2
- permits on file
- Aug 30, 1993
- last permit issued
- Nov 29, 1993
- completed
- 0
- cumulative oil, bbl
- 336K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 1993 THROUGH Apr 2000
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 29, 1993
- Shut in
- —
- Plugged
- Sep 26, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ray, George G-2-147971 | Pettus, E. (a-1 Wilcox) | Okla. Magic Circle Energy Corp. | 1 | 0 | 336K | Nov 1993 – Apr 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Christico Petroleum CompanyDec 1993 → Jun 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 415349-98 | Drill | Christico Petroleum Company | Feb 16, 1994 | Aug 30, 1993 | — | 8,400 |
| 415349-99 | Drill | Christico Petroleum Company | Aug 30, 1993 | Aug 30, 1993 | Sep 3, 1993 | 8,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-147971 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 332 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,265 | 8,275 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,084 | 14.75 | 1,115 S |
| 7 | 7,763 | 9.875 | 510 S |
| 3.5 | 8,500 | 6.125 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 10, 1994 | Dec 14, 1993 | Yes |
| 00 | Feb 23, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-32724 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-32724 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17532724, documented in the API reference.