WELL · 42-175-33062 · DISTRICT 2
Schorlemmer #2
Goliad County · Weesatche NE. (Holt FB A) field · Vertical
Schorlemmer #2 (API 42-175-33062) is a plugged well in Goliad County, plugged May 3, 2013, last operated by Linc Gulf Coast Petroleum Inc..
The RRC has issued one drilling permit (amended once), issued May 4, 1998, permitted to 11,700 ft.
It was permitted by Tri-Union Development Corp. and has since transferred to Linc Gulf Coast Petroleum Inc. on the wellbore schedule.
Operator of record
Linc Gulf Coast Petroleum Inc.
Permitted by Tri-Union Development Corp.; the EWA schedule now lists a different operator.
Katy, TX · P-5 Y, filed Jan 5, 2018 · 156 permits on file · (281) 385-5220
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Linc Gulf Coast Petroleum Inc. |
| Production reports | Erg Resources, L.L.C.through Feb 2011 |
| Latest permit | Kebo Oil & Gas, Inc.May 4, 1998 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,700
- total depth, ft
- 2
- permits on file
- May 4, 1998
- last permit issued
- May 5, 2000
- completed
- 0
- cumulative oil, bbl
- 2.76M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 1998 THROUGH May 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 5, 2000
- Shut in
- —
- Plugged
- May 3, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Schorlemmer G-2-173271 | Weesatche, NE. (Holt FB A) | Linc Gulf Coast Petroleum, Inc. | 1 | 0 | 2.76M | Nov 1998 – May 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Tri-Union Development Corp.Dec 1998 → Nov 2002
- 2Erg Operating Company, Inc.Dec 2002 → Dec 2006
- 3Erg Resources, L.L.C.Jan 2007 → Feb 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 472877-98 | Drill | Tri-Union Development Corp. | Sep 18, 1998 | May 4, 1998 | Sep 26, 1998 | 11,400 |
| 472877-99 | Drill | Kebo Oil & Gas, Inc. | Feb 2, 1998 | May 4, 1998 | — | 11,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-173271 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,689 | 10,817 | Perforated |
| 10,920 | 10,993 | Perforated |
| 11,289 | 11,344 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,757 | 4.75 | 850 S |
| 10.75 | 1,757 | 14.75 | 850 S |
| 7.625 | 9,616 | 9.625 | 540 S |
| 4.5 | 11,500 | 6.75 | 280 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 5, 2001 | Aug 10, 2000 | — |
| 00 | Dec 1, 1999 | Jul 19, 1999 | — |
| 00 | Oct 27, 1999 | Jul 14, 1998 | — |
| 00 | Sep 1, 1999 | May 10, 1999 | Yes |
| 00 | Jun 28, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-33062 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-33062 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17533062, documented in the API reference.