WELL · 42-175-33084 · DISTRICT 2
Davis #3
Goliad County · Weesatche NE. (Holt FB A) field · Temp Abandoned · Vertical
Davis #3 (API 42-175-33084) is a well in Goliad County operated by Nitro Oil & Gas LLC, completed July 2, 1998 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued April 23, 1998, permitted to 11,500 ft.
It was permitted by Acock Engineering & Assoc., Inc. and has since transferred to Nitro Oil & Gas LLC on the wellbore schedule.
Completion filings report one formation top, including Wilcox.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Acock Engineering & Assoc., Inc.; the EWA schedule now lists a different operator.
Cuero, TX · P-5 Y, filed Jan 5, 2026 · (361) 243-0110
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Nitro Oil & Gas LLC |
| Production reports | Geiser Operating, Inc.through May 2015 |
| Latest permit | Acock Engineering & Assoc., Inc.Apr 23, 1998 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,500
- total depth, ft
- 1
- permits on file
- Apr 23, 1998
- last permit issued
- Jul 2, 1998
- completed
- 0
- cumulative oil, bbl
- 1.22M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 1998 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 2, 1998
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Davis G-2-169888 | Weesatche, NE. (Holt FB A) | Nitro Oil & Gas, LLC | 1 | 0 | 1.22M | Jul 1998 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Acock Engineering & Assoc., Inc.Jul 1998 → Jul 2002
- 2Acock/Anaqua Operating Co., LCAug 2002 → Apr 2004
- 3Acock/Anaqua Operating Co., LPMay 2004 → May 2006
- 4Acock Operating LimitedJun 2006 → Sep 2014
- 5Geiser Operating, Inc.Oct 2014 → May 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 475334-99 | Drill | Acock Engineering & Assoc., Inc. | Apr 15, 1998 | Apr 23, 1998 | Apr 29, 1998 | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-169888 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 283 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,281 | 11,291 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,660 | 14.75 | 700 S |
| 7.625 | 9,600 | 9.875 | 425 S |
| 3.5 | 11,479 | 6.75 | 550 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 24, 1999 | Jul 24, 1998 | — |
| 00 | Dec 8, 1998 | Jul 13, 1998 | Yes |
| 00 | Sep 24, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-33084 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-33084 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17533084, documented in the API reference.