WELL · 42-175-33268 · DISTRICT 2
Prewit #3A
Goliad County · Consolidated (Wilcox 10500) field · Vertical
Prewit #3A (API 42-175-33268) is a well in Goliad County operated by Everest Resource Company, completed September 13, 2000.
The RRC has issued 2 drilling permits between 2000 and 2004, permitted to 11,100 ft.
Completion filings report one formation top, including Wilcox.
Its 2 leases have reported 1.35K barrels of oil and 1.02M mcf of gas since September 2000, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Corpus Chrsti, TX · P-5 Y, filed Dec 4, 2025 · 113 permits on file · (361) 688-1025
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Everest Resource Company |
| Production reports | Everest Resource Companythrough Apr 2026 |
| Latest permit | Everest Resource CompanyMay 5, 2004 |
- 11,100
- total depth, ft
- 2
- permits on file
- May 5, 2004
- last permit issued
- Sep 13, 2000
- completed
- 1.35K
- cumulative oil, bbl
- 1.02M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2000 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 13, 2000
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Prewitt G-2-205331 | Weesatche, NE. (Holt FB A) | Everest Resource Company | 1 | 0 | 934K | Oct 2003 – Jul 2026 |
| Prewit O-2-8574 | Consolidated (Wilcox 10500) | Everest Resource Company | 2 | 1.35K | 84.8K | Sep 2000 – Jul 2005 |
Gas, mcf lease total
Last 12 months 11,187 · prior 12 2,279(+391%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Consolidated Petro Ptnrs I, LLCSep 2000 → Jul 2001
- 2Everest Resource CompanyJun 2003 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 545355-99 | Recompletion | Everest Resource Company | May 5, 2004 | May 5, 2004 | — | 11,100 |
| 497186-99 | Drill | Consolidated Petro Ptnrs I, LLC | Jul 13, 2000 | Jul 13, 2000 | Aug 1, 2000 | 11,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-205331 | — | — | — | — |
| — | — O-2-8574 | — | — | — | — |
| — | — O-2-8574 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 301 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Wilcox | 7,642 | -7,341 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,794 | 10,862 | Perforated |
| 10,971 | 11,008 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,703 | 12.25 | 795 S |
| 7.625 | 9,200 | 9.875 | 410 S |
| 4.5 | 11,100 | 6.75 | 315 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 11, 2005 | Mar 29, 2004 | — |
| 00 | Jan 13, 2005 | — | — |
| 00 | Jan 31, 2001 | Nov 20, 2000 | Yes |
| 00 | Dec 12, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-33268 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-33268 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17533268, documented in the API reference.