WELL · 42-175-33277 · DISTRICT 2
Wood #67
Goliad County · Sarco Creek (5100) field · Vertical
Wood #67 (API 42-175-33277) is a permitted well in Goliad County filed by Charro Operating, L.L.C.; no completion report is on file yet.
The RRC has issued one drilling permit, issued August 21, 2000, permitted to 5,300 ft.
Completion filings report 3 formation tops, including Catahoula, Frio, Vicksburg.
Its 2 leases have reported 289K barrels of oil and 836K mcf of gas since September 2000, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.
Operator of record
Englewood, CO · P-5 Y, filed Feb 4, 2026 · 326 permits on file · (303) 799-9828
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Charro Operating L.L.C. |
| Production reports | Charro Operating, L.L.C.through Apr 2026 |
| Latest permit | Charro Operating, L.L.C.Aug 21, 2000 |
- 5,300
- total depth, ft
- 1
- permits on file
- Aug 21, 2000
- last permit issued
- —
- completed
- 289K
- cumulative oil, bbl
- 836K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2000 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wood G-2-182277 | Sarco Creek (5000) | Charro Operating, L.L.C. | 1 | 0 | 752K | Sep 2000 – Jul 2026 |
| Wood O-2-8620 | Sarco Creek (5100) | Charro Operating, L.L.C. | 4 | 289K | 84.1K | Sep 2000 – Jul 2026 |
Oil, barrels lease total
Last 12 months 6,433 · prior 12 2,978(+116%)
Gas, mcf lease total
Last 12 months 276 · prior 12 51(+441%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Charro Operating, L.L.C.Sep 2000 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 498687-99 | Drill | Charro Operating, L.L.C. | Aug 21, 2000 | Aug 21, 2000 | Sep 18, 2000 | 5,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-182277 | — | — | — | — |
| — | — O-2-8620 | — | — | — | — |
| — | — O-2-8620 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 127 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,968 | 4,978 | Perforated |
| 5,124 | 5,128 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 532 | 12.25 | 245 S |
| 4.5 | 5,150 | 7.875 | 1,300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 3, 2001 | Feb 2, 2001 | Yes |
| 00 | Jul 20, 2001 | Feb 2, 2001 | Yes |
| 00 | May 23, 2001 | — | — |
| 00 | May 11, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-33277 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-33277 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17533277, documented in the API reference.