WELL · 42-175-33452 · DISTRICT 2
Haring #1
Goliad County · McCaskill (Lower Wilcox) field · Temp Abandoned · Vertical
Haring #1 (API 42-175-33452) is a well in Goliad County operated by Tidewater Minerals Corporation, completed October 29, 2002 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued August 27, 2002, permitted to 16,000 ft.
It was permitted by El Paso Production Oil & Gas CO. and has since transferred to Tidewater Minerals Corporation on the wellbore schedule.
No lease production has been reported under this well’s leases.
Operator of record
Tidewater Minerals Corporation
Permitted by EL Paso Production Oil & Gas Co.; the EWA schedule now lists a different operator.
Orange Grove, TX · P-5 Y, filed Feb 4, 2026 · 10 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tidewater Minerals Corporation |
| Production reports | Tidewater Minerals Corporationthrough Jan 2014 |
| Latest permit | EL Paso Production Oil & Gas Co.Aug 27, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 16,000
- total depth, ft
- 1
- permits on file
- Aug 27, 2002
- last permit issued
- Oct 29, 2002
- completed
- 0
- cumulative oil, bbl
- 818K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2002 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 29, 2002
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Haring G-2-192592 | McCaskill (Lower Wilcox) | Tidewater Minerals Corporation | 1 | 0 | 818K | Oct 2002 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EL Paso Production Oil & Gas Co.Nov 2002 → Apr 2006
- 2Smith Production Inc.May 2006 → Dec 2006
- 3Edge Petroleum Oper. Co., Inc.Jan 2007 → Jul 2010
- 4Tidewater Minerals CorporationAug 2010 → Jan 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 523137-99 | Drill | EL Paso Production Oil & Gas Co. | Aug 26, 2002 | Aug 27, 2002 | Sep 3, 2002 | 16,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-192592 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 15,602 | 15,781 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 3,022 | 17.5 | 1,995 S |
| 9.625 | 10,005 | 12.5 | 1,365 S |
| 5 | 16,000 | 8.5 | 1,440 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 19, 2003 | Dec 19, 2002 | Yes |
| 00 | Feb 5, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-33452 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-33452 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17533452, documented in the API reference.