WELL · 42-175-33511 · DISTRICT 2
Hanley Hicks #1A
Goliad County · Oconnor Ranch (Frio Cons.) field · Vertical
Hanley Hicks #1A (API 42-175-33511) is a plugged well in Goliad County, plugged December 16, 2005, last operated by Edge Petroleum Oper. CO. Inc..
The RRC has issued 2 drilling permits between 2003 and 2005, permitted to 4,100 ft.
Completion filings report one formation top, including Frio.
Operator of record
Houston, TX · P-5 Inactive, filed Jul 15, 2010 · 433 permits on file · (713) 954-5588
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Edge Petroleum Oper. Co. Inc. |
| Production reports | Edge Petroleum Oper. Co., Inc.through Jun 2005 |
| Latest permit | Edge Petroleum Oper. Co., Inc.Aug 15, 2005 |
- 4,100
- total depth, ft
- 2
- permits on file
- Aug 15, 2005
- last permit issued
- Aug 30, 2003
- completed
- 0
- cumulative oil, bbl
- 595K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2003 THROUGH Dec 2005
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 30, 2003
- Shut in
- —
- Plugged
- Dec 16, 2005
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hanley Hicks G-2-199110 | Oconnor Ranch (Frio Cons.) | Edge Petroleum Oper. Co., Inc. | 1 | 0 | 588K | Aug 2003 – Dec 2005 |
| Hanley-Hicks G-2-218786 | Alkek (Catahoula 2500) | Edge Petroleum Oper. Co., Inc. | 1 | 0 | 7.16K | May 2005 – Dec 2005 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Edge Petroleum Oper. Co., Inc.Aug 2003 → Jun 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 604946-99 | Recompletion | Edge Petroleum Oper. Co., Inc. | Aug 15, 2005 | Aug 15, 2005 | — | 4,100 |
| 530318-99 | Drill | Edge Petroleum Oper. Co., Inc. | Apr 4, 2003 | Jun 27, 2003 | Aug 18, 2003 | 4,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-199110 | — | — | — | — |
| — | — G-2-218786 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 144 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Frio | 3,840 | -3,696 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,536 | 2,541 | Perforated |
| 3,846 | 3,858 | Perforated |
| 3,862 | 3,874 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 410 | 12.25 | 200 S |
| 2.875 | 4,081 | 7.875 | 900 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 30, 2007 | Oct 13, 2005 | Yes |
| 00 | Sep 8, 2006 | — | — |
| 00 | Apr 22, 2004 | Oct 22, 2003 | Yes |
| 00 | Feb 12, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-33511 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-33511 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17533511, documented in the API reference.