WELL · 42-175-33560 · DISTRICT 2
Albrecht #1
Goliad County · Yanta (Wilcox Lower) field · Vertical
Albrecht #1 (API 42-175-33560) is a plugged well in Goliad County, plugged April 20, 2012, last operated by Escondido Petroleum Company Inc.
The RRC has issued 2 drilling permits (amended once) between 2003 and 2008, permitted to 17,500 ft.
Completion filings report 3 formation tops, including Yegua, Wilcox, L. Wilcox.
Operator of record
Escondido Petroleum Company Inc
Houston, TX · P-5 Y, filed Oct 4, 2025 · 160 permits on file · (713) 823-2996
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Escondido Petroleum Company Inc |
| Production reports | Escondido Petroleum Company, Incthrough Nov 2008 |
| Latest permit | Escondido Petroleum Company, IncOct 15, 2008 |
- 17,500
- total depth, ft
- 3
- permits on file
- Oct 15, 2008
- last permit issued
- Jan 8, 2008
- completed
- 0
- cumulative oil, bbl
- 126K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2004 THROUGH Apr 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 8, 2008
- Shut in
- —
- Plugged
- Apr 20, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Albrecht G-2-240936 | Yanta (Wilcox Lower) | Escondido Petroleum Company, Inc | 1 | 0 | 3.28K | Jan 2008 – Apr 2012 |
| Albrecht G-2-205324 | Mickey Meadow (WX Migura Lo.) | Escondido Petroleum Company, Inc | 1 | 0 | 122K | Jan 2004 – Jan 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EL Paso Production Oil & Gas Co.Apr 2004 → Oct 2004
- 2Escondido Petroleum Company, IncSep 2005 → Nov 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 669050-99 | Recompletion | Escondido Petroleum Company, Inc | Aug 13, 2008 | Oct 15, 2008 | Jan 3, 2008 | 16,944 |
| 535401-98 | Drill | EL Paso Production Oil & Gas Co. | Aug 10, 2004 | Aug 15, 2003 | — | 17,500 |
| 535401-99 | Drill | EL Paso Production Oil & Gas Co. | Aug 15, 2003 | Aug 15, 2003 | Oct 8, 2003 | 17,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-205324 | — | — | — | — |
| — | — G-2-240936 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 294 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,858 | 10,870 | Perforated |
| 14,662 | 14,678 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,530 | 17.5 | 1,875 S |
| 9.625 | 8,920 | 12.25 | 775 S |
| 5 | 16,944 | 6.25 | 1,284 S |
| 5 | 16,944 | 6.5 | 1,284 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 5, 2009 | Aug 21, 2008 | Yes |
| 00 | Jan 15, 2009 | Oct 23, 2008 | — |
| 00 | Oct 23, 2008 | — | — |
| 00 | Mar 31, 2005 | Mar 30, 2004 | Yes |
| 00 | Jan 12, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-33560 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-33560 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17533560, documented in the API reference.