WELL · 42-175-33664 · DISTRICT 2

Gohlke Unit #1

Y

Goliad County · Poehler East (Yegua C) field · Producing  · Vertical

Gohlke Unit #1 (API 42-175-33664) is a well in Goliad County operated by SM Operating Company LLC, completed December 12, 2004 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued October 13, 2004, permitted to 6,000 ft.

It was permitted by Acock/Anaqua Operating CO., LP and has since transferred to SM Operating Company LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Vicksburg, Jackson, Yegua.

Its lease has reported 53.4K barrels of oil and 77.5K mcf of gas since December 2004, last reporting in July 2026.

Operator of record

SM Operating Company LLC

Permitted by Acock/Anaqua Operating Co., LP; the EWA schedule now lists a different operator.

Austin, TX · P-5 Y, filed Oct 4, 2025 · (713) 557-0299

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSM Operating Company LLC
Production reportsSM Operating Company LLCthrough Mar 2026
Latest permitAcock/Anaqua Operating Co., LPOct 13, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,000
total depth, ft
2
permits on file
Oct 13, 2004
last permit issued
Dec 12, 2004
completed
53.4K
cumulative oil, bbl
77.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 12, 2004
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gohlke Unit O-2-8938Poehler, East (Yegua C)SM Operating Company LLC153.4K77.5KDec 2004 – Jul 2026

Oil, barrels lease total

Last 12 months 117 · prior 12 1,203(-90%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Acock/Anaqua Operating Co., LPDec 2004 → Dec 2009
  2. 2Acock Operating LimitedMay 2005 → May 2009
  3. 3Hankey Oil CompanyJan 2010 → Feb 2010
  4. 4Hankey Operating, Inc.Mar 2010 → Mar 2015
  5. 5G Force Energy, LLCMay 2016 → Dec 2019
  6. 6SM Operating Company LLCJan 2020 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
552049-98DrillAcock/Anaqua Operating Co., LPJan 13, 2005Oct 13, 2004—6,000
552049-99DrillAcock/Anaqua Operating Co., LPOct 8, 2004Oct 13, 2004Oct 17, 20046,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-8938————

Formation tops

As filed on W-2/G-1. Subsea from 265 ft elevation.Download CSV →

FormationMD ftSubsea
VicksburgTOP OF VICKSBURG3,150-2,885
JacksonTOP OF JACKSON3,600-3,335
YeguaTOP OF YEGUA4,500-4,235

Perforations

Perforated and open-hole intervals.

FromToType
4,6894,700Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62576812.25280 S
4.55,4007.8751,260 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 18, 2005Jan 19, 2005Yes
00Jan 31, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17533664, documented in the API reference.