WELL · 42-175-33862 · DISTRICT 2
Padre #1
Goliad County · Bego (Consolidated) field · Vertical
Padre #1 (API 42-175-33862) is a plugged well in Goliad County, plugged March 18, 2009, last operated by Wadi Petroleum Inc..
The RRC has issued one drilling permit, issued December 9, 2005, permitted to 13,500 ft.
It was permitted by Texakoma Operating, L.P. and has since transferred to Wadi Petroleum Inc. on the wellbore schedule.
Completion filings report 4 formation tops, including Luling Wilcox, Austin Chalk, Nita Wilcox, Brandon Wilcox.
Operator of record
Permitted by Texakoma Operating, L.P.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Nov 2, 2018 · 41 permits on file · (281) 723-8358
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wadi Petroleum Inc. |
| Production reports | Wadi Petroleum, Inc.through Aug 2008 |
| Latest permit | Texakoma Operating, L.P.Dec 9, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,500
- total depth, ft
- 1
- permits on file
- Dec 9, 2005
- last permit issued
- Apr 24, 2007
- completed
- 0
- cumulative oil, bbl
- 42.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2006 THROUGH Sep 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 24, 2007
- Shut in
- —
- Plugged
- Mar 18, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Padre G-2-220983 | Bego (Consolidated) | Wadi Petroleum, Inc. | 1 | 0 | 42.7K | Jun 2006 – Sep 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Wadi Petroleum, Inc.Apr 2007 → Aug 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 610753-99 | Drill | Texakoma Operating, L.P. | Dec 8, 2005 | Dec 9, 2005 | — | 13,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-220983 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 141 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Luling Wilcox | 9,600 | -9,459 |
| Austin ChalkAUSTIN WILCOX | 10,650 | -10,509 |
| Nita Wilcox | 11,300 | -11,159 |
| Brandon Wilcox | 12,200 | -12,059 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,585 | 12,602 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 1,779 | 20 | 1,790 S |
| 10.75 | 4,852 | 14.75 | 1,060 S |
| 10.75 | 4,964 | 14.75 | 1,060 S |
| 7.625 | 10,142 | 9.625 | 430 S |
| 7.625 | 10,142 | 9.875 | 430 S |
| 4.5 | 12,950 | 6.75 | 525 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 16, 2007 | Jun 1, 2007 | — |
| 00 | Mar 8, 2007 | Jul 12, 2006 | Yes |
| 00 | Nov 8, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-33862 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-33862 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17533862, documented in the API reference.