WELL · 42-175-34018 · DISTRICT 2
Loehr #1B
Goliad County · Karen Beauchamp (3200) field · Vertical
Loehr #1B (API 42-175-34018) is a plugged well in Goliad County, plugged October 29, 2012, last operated by Geiser Operating Inc..
The RRC has issued 5 drilling permits (amended once) between 2007 and 2010, permitted to 3,350 ft.
Completion filings report 2 formation tops, including Top Of Caahoula, Catahoula.
Operator of record
Portland, TX · P-5 Y, filed Aug 2, 2019 · 33 permits on file · (361) 813-3989
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Geiser Operating Inc. |
| Production reports | Geiser Operating, Inc.through May 2012 |
| Latest permit | Geiser Operating, Inc.Nov 5, 2010 |
- 3,350
- total depth, ft
- 6
- permits on file
- Nov 5, 2010
- last permit issued
- Oct 23, 2007
- completed
- 0
- cumulative oil, bbl
- 161K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2007 THROUGH Oct 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 23, 2007
- Shut in
- —
- Plugged
- Oct 29, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Loehr G-2-258700 | Karen Beauchamp (2100) | Geiser Operating, Inc. | 1 | 0 | 43.2K | Dec 2010 – Oct 2012 |
| Loehr G-2-257763 | Karen Beauchamp (2300) | Geiser Operating, Inc. | 1 | 0 | 1.1K | Aug 2010 – Dec 2010 |
| Loehr G-2-244783 | Karen Beauchamp (2800) | Geiser Operating, Inc. | 1 | 0 | 78.1K | Jan 2009 – Aug 2010 |
| Loehr G-2-237003 | Karen Beauchamp (3000) | Geiser Operating, Inc. | 1 | 0 | 13.5K | Jun 2008 – Jan 2009 |
| Loehr G-2-232505 | Karen Beauchamp (3200) | Geiser Operating, Inc. | 1 | 0 | 25.5K | Oct 2007 – Jun 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Geiser Operating, Inc.Oct 2007 → May 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 704629-99 | Recompletion | Geiser Operating, Inc. | Nov 1, 2010 | Nov 5, 2010 | Dec 1, 2010 | 3,299 |
| 701000-99 | Recompletion | Geiser Operating, Inc. | Aug 20, 2010 | Aug 25, 2010 | Aug 26, 2010 | 3,299 |
| 675881-99 | Recompletion | Geiser Operating, Inc. | Dec 4, 2008 | Dec 18, 2008 | Jan 13, 2009 | 3,299 |
| 662447-99 | Recompletion | Geiser Operating, Inc. | May 20, 2008 | Jun 16, 2008 | Jun 6, 2008 | 3,299 |
| 644050-98 | Drill | Geiser Operating, Inc. | Dec 18, 2007 | Aug 13, 2007 | Sep 14, 2007 | 3,350 |
| 644050-99 | Drill | Geiser Operating, Inc. | Aug 8, 2007 | Aug 13, 2007 | Sep 14, 2007 | 3,350 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-232505 | — | — | — | — |
| — | — G-2-237003 | — | — | — | — |
| — | — G-2-244783 | — | — | — | — |
| — | — G-2-257763 | — | — | — | — |
| — | — G-2-258700 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 245 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Top of Caahoula | 3,148 | -2,903 |
| CatahoulaTOP OF CATAHOULA | 3,148 | -2,903 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,139 | 2,145 | Perforated |
| 2,216 | 2,219 | Perforated |
| 2,858 | 2,864 | Perforated |
| 3,046 | 3,052 | Perforated |
| 3,148 | 3,151 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 704 | 12.25 | 165 S |
| 4.5 | 3,297 | 7.875 | 256 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 17, 2011 | Dec 20, 2010 | Yes |
| 00 | Jan 27, 2011 | — | — |
| 00 | Dec 3, 2010 | Sep 16, 2010 | Yes |
| 00 | Oct 22, 2010 | — | — |
| 00 | Mar 7, 2009 | Jan 27, 2009 | Yes |
| 00 | Feb 10, 2009 | — | — |
| 00 | Sep 24, 2008 | Jul 2, 2008 | Yes |
| 00 | Jul 25, 2008 | — | — |
| 00 | Feb 11, 2008 | Nov 5, 2007 | Yes |
| 00 | Jan 28, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-34018 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-34018 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17534018, documented in the API reference.