WELL · 42-175-34044 · DISTRICT 2
Loest #2
Goliad County · Powder River (Consolidated) field · Vertical
Loest #2 (API 42-175-34044) is a plugged well in Goliad County, plugged October 9, 2020, last operated by Goliad Holdings LLC.
The RRC has issued one drilling permit, issued December 5, 2007, permitted to 4,000 ft.
It was permitted by Transcontinental Minerals Corp. and has since transferred to Goliad Holdings LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Miocene (undifferentiated), Frio.
Operator of record
Permitted by Transcontinental Minerals Corp.; the EWA schedule now lists a different operator.
Columbia, MS · P-5 Y, filed Oct 2, 2020 · (601) 736-1425
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Goliad Holdings LLC |
| Production reports | Goliad Holdings, LLCthrough Jul 2013 |
| Latest permit | Transcontinental Minerals Corp.Dec 5, 2007 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 1
- permits on file
- Dec 5, 2007
- last permit issued
- May 13, 2008
- completed
- 0
- cumulative oil, bbl
- 310K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2008 THROUGH Oct 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 13, 2008
- Shut in
- —
- Plugged
- Oct 9, 2020
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Loest G-2-240719 | Powder River (Consolidated) | Goliad Holdings, LLC | 1 | 0 | 310K | May 2008 – Oct 2020 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Transcontinental Minerals Corp.May 2008 → Oct 2008
- 2Dirnett, Inc.Nov 2008 → Feb 2009
- 3Goliad Holdings, LLCMar 2009 → Jul 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 650072-99 | Drill | Transcontinental Minerals Corp. | Nov 21, 2007 | Dec 5, 2007 | May 8, 2008 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-240719 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 266 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 800 | -534 |
| Frio | 1,720 | -1,454 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,750 | 2,752 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 711 | 12.25 | 235 S |
| 2.875 | 3,572 | 7.875 | 772 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 11, 2008 | Oct 13, 2008 | Yes |
| 00 | Oct 20, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-34044 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-34044 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17534044, documented in the API reference.