WELL · 42-175-34164 · DISTRICT 2
Liesman #1
Goliad County · Ander (Frio 3000) field · Vertical
Liesman #1 (API 42-175-34164) is a plugged well in Goliad County, plugged September 27, 2013, last operated by Rincon Petroleum Corporation.
The RRC has issued one drilling permit (amended twice), issued May 18, 2010, permitted to 5,500 ft.
It was permitted by Esenjay Operating, Inc. and has since transferred to Rincon Petroleum Corporation on the wellbore schedule.
Completion filings report 2 formation tops, including Frio, Yegua.
Operator of record
Permitted by Esenjay Operating, Inc.; the EWA schedule now lists a different operator.
Corpus Chrsti, TX · P-5 Y, filed Apr 4, 2026 · 259 permits on file · (361) 960-9033
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rincon Petroleum Corporation |
| Production reports | Rincon Petroleum Corporationthrough Jul 2012 |
| Latest permit | Esenjay Operating, Inc.May 18, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,500
- total depth, ft
- 3
- permits on file
- May 18, 2010
- last permit issued
- Mar 10, 2011
- completed
- 0
- cumulative oil, bbl
- 16.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2011 THROUGH Sep 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 10, 2011
- Shut in
- —
- Plugged
- Sep 27, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Liesman G-2-266638 | Ander (Frio 3000) | Rincon Petroleum Corporation | 1 | 0 | 16.9K | Mar 2011 – Sep 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Esenjay Operating, Inc.Mar 2011 → Jul 2011
- 2Rincon Petroleum CorporationAug 2011 → Jul 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 696119-97 | Drill | Esenjay Operating, Inc. | Mar 22, 2011 | May 18, 2010 | Jul 17, 2010 | 5,500 |
| 696119-98 | Drill | Esenjay Operating, Inc. | Nov 16, 2010 | May 18, 2010 | — | 5,500 |
| 696119-99 | Drill | Esenjay Operating, Inc. | May 17, 2010 | May 18, 2010 | — | 5,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-266638 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 192 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,909 | 2,911 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,627 | 12.25 | 670 S |
| 2.875 | 5,487 | 7.875 | 1,190 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 19, 2013 | Apr 1, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-175-34164 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-175-34164 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17534164, documented in the API reference.