WELL · 42-175-34245 · DISTRICT 2

Worley GU #3

Y

Goliad County · Emma Haynes (11 400 Wilcox) field · Producing  · Vertical

Worley GU #3 (API 42-175-34245) is a well in Goliad County operated by Erskine Energy LLC, completed May 1, 2017 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued October 6, 2016, permitted to 13,800 ft.

It was permitted by Alta Mesa Services, LP and has since transferred to Erskine Energy LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Catahoula, Frio, Vicksburg, Emma Haynes (11,400 Wilcox).

No lease production has been reported under this well’s leases.

Operator of record

Erskine Energy LLC

Permitted by Alta Mesa Services, LP; the EWA schedule now lists a different operator.

Hot Springs V, AR · P-5 Y, filed Sep 4, 2025 · 103 permits on file · (281) 704-1338

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleErskine Energy LLC
Production reportsErskine Energy, LLCthrough Apr 2026
Latest permitAlta Mesa Services, LPOct 6, 2016

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,800
total depth, ft
2
permits on file
Oct 6, 2016
last permit issued
May 1, 2017
completed
0
cumulative oil, bbl
222K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2017 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 1, 2017
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Worley GU G-2-282440Emma Haynes (11,400 Wilcox)Erskine Energy, LLC10222KMay 2017 – Jul 2026

Gas, mcf lease total

Last 12 months 13,619 · prior 12 1,853(+635%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Alta Mesa Services, LPMay 2017 → Jun 2018
  2. 2Spri Oil & Gas, LLCJul 2018 → Mar 2020
  3. 3Raven Forest Operating, LLCApr 2020 → Dec 2023
  4. 4Erskine Energy, LLCJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
819134-98DrillAlta Mesa Services, LPMar 14, 2017Oct 6, 2016Nov 9, 201613,800
819134-99DrillAlta Mesa Services, LPOct 5, 2016Oct 6, 2016Nov 9, 201613,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-282440————

Formation tops

As filed on W-2/G-1. Subsea from 255 ft elevation.Download CSV →

FormationMD ftSubsea
CatahoulaCATAHOULA - DISPOSAL1,184-929
FrioFRIO - DISPOSAL2,629-2,374
VicksburgVICKSBURG - DISPOSAL3,169-2,914
Emma Haynes (11,400 Wilcox)10,633-10,378

Perforations

Perforated and open-hole intervals.

FromToType
11,18611,202Perforated
11,45611,474Perforated
11,72011,760Perforated
12,79412,824Perforated
13,27613,286Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,59014.751,403 S
7.62510,1309.8751,231 S
4.513,5016.25399 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 27, 2018Jan 29, 2018—
00Sep 6, 2017May 31, 2017Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17534245, documented in the API reference.