WELL · 42-177-30779 · DISTRICT 1
Christian Henry E. #2R
Gonzales County · Christian (6800) field · Vertical
Christian Henry E. #2R (API 42-177-30779) is a plugged well in Gonzales County, plugged December 6, 1990, last operated by Quinney K. A..
The RRC has issued 2 drilling permits between 1981 and 2012, permitted to 7,000 ft.
It was permitted by Tri-Force Exploration, L.L.C. and has since transferred to Quinney K. A. on the wellbore schedule.
Completion filings report 3 formation tops, including Austin Chalk, False Buda, Buda.
Operator of record
Permitted by Tri-Force Exploration, L.L.C.; the EWA schedule now lists a different operator.
LA Grange, TX · P-5 Y, filed Jul 8, 1992
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Quinney K. A. |
| Production reports | none |
| Latest permit | Tri-Force Exploration, L.L.C.Sep 21, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,000
- total depth, ft
- 2
- permits on file
- Sep 21, 2012
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Dec 6, 1990
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Christian,h.e. O-1-17840 | Christian (6800) | Tri-Force Exploration, L.L.C. | 1 | 0 | 0 | Jun 2013 – Jul 2026 |
| Christian, Henry E. O-1-6529 | Christian (6800) | Quinney, K. A. | 4 | 0 | 0 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 747304-99 | Reenter | Tri-Force Exploration, L.L.C. | Aug 28, 2012 | Sep 21, 2012 | Nov 12, 2012 | 6,819 |
| 106398-99 | Drill | Energetics, Inc. | Jan 26, 1981 | Jan 26, 1981 | — | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-6529 | — | — | — | — |
| — | — O-1-17840 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 274 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 6,284 | -6,010 |
| False Buda | 6,696 | -6,422 |
| Buda | 6,724 | -6,450 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,699 | 6,760 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,714 | 12.25 | 990 S |
| 4.5 | 6,818 | 7.875 | 50 S |
| 4.5 | 6,818 | 12.25 | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 21, 2014 | Jun 9, 2014 | Yes |
| 00 | Nov 16, 1988 | Nov 4, 1988 | — |
| 00 | Nov 10, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-177-30779 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-177-30779 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17730779, documented in the API reference.