WELL · 42-177-31240 · DISTRICT 1

Nixon Farms #2

Plugged

Gonzales County · Peach Creek (Austin Chalk) field  · Vertical

Nixon Farms #2 (API 42-177-31240) is a plugged well in Gonzales County, plugged July 9, 1998, last operated by Tdc Engineering Inc..

The RRC has issued 2 drilling permits between 1982 and 1992, permitted to 8,100 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Tdc Engineering Inc. on the wellbore schedule.

Completion filings report one formation top, including Wilcox.

Its lease has reported 19.4K barrels of oil and 8.03K mcf of gas since January 1993, last reporting in August 2003. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

TDC Engineering Inc.

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Aug 4, 2025 · 227 permits on file · (325) 668-6333

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTDC Engineering Inc.
Production reportsChesapeake Operating, Inc.through Aug 1994
Latest permitChesapeake Operating, Inc.Apr 15, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,100
total depth, ft
2
permits on file
Apr 15, 1992
last permit issued
Apr 18, 1992
completed
19.4K
cumulative oil, bbl
8.03K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 18, 1992
Shut in
—
Plugged
Jul 9, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nixon Farms O-1-13302Peach Creek (Austin Chalk)TDC Engineering, Inc.219.4K8.03KJan 1993 – Aug 2003

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Jan 1993 → Aug 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
398235-99ReenterChesapeake Operating, Inc.Apr 9, 1992Apr 15, 1992Feb 13, 19928,025
150455-99DrillZonergy, Inc.Feb 8, 1982Feb 8, 1982—8,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-13302————

Formation tops

As filed on W-2/G-1. Subsea from 263 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox3,342-3,079

Perforations

Perforated and open-hole intervals.

FromToType
7,5807,920Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,28812.25975 S
4.53,3007.875500 S
2.3757,770——
4.58,0257.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 23, 1993Jan 26, 1993—
00Feb 24, 1993——
00Jan 12, 1984Mar 22, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
146K
bbl, all reported
Nov 1998
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000079635W-14 DisposalPlugged Sep 8, 19981,5001,2003,300–3,800

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119971998

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17731240, documented in the API reference.