WELL · 42-177-31326 · DISTRICT 1
Emily Unit #1
Gonzales County · Pearsall (Austin Chalk) field · Horizontal · Sidetrack
Emily Unit #1 (API 42-177-31326) is a plugged horizontal well in Gonzales County, plugged September 1, 1992, last operated by Calix Corporation.
The RRC has issued 2 drilling permits (amended once) between 1982 and 1989, permitted to 8,000 ft.
It was permitted by Black Gold Operating CO., Inc. and has since transferred to Calix Corporation on the wellbore schedule.
Completion filings report 2 formation tops, including Anacacho, Austin Chalk.
Operator of record
Permitted by Black Gold Operating Co., Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Nov 12, 1992 · 33 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Calix Corporation |
| Production reports | none |
| Latest permit | Black Gold Operating Co., Inc.Dec 29, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,000
- total depth, ft
- 3
- permits on file
- Dec 29, 1989
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Sep 1, 1992
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Emily Unit O-1-8644 | Peach Creek (Austin Chalk) | Goetz Services, Inc. | 1 | 0 | 0 | Jan 1993 – Aug 2003 |
| — O-1-13362 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 368132-98 | Recompletion · sidetrack | Black Gold Operating Co., Inc. | Jan 30, 1990 | Dec 29, 1989 | — | 7,900 |
| 368132-99 | Recompletion · sidetrack | Black Gold Operating Co., Inc. | Dec 29, 1989 | Dec 29, 1989 | — | 7,900 |
| 165290-99 | Drill | Calix Corporation | Jul 1, 1982 | Jul 1, 1982 | — | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-8644 | — | — | — | — |
| — | — O-1-13362 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 281 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Anacacho | 7,255 | -6,974 |
| Austin Chalk | 7,406 | -7,125 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,230 | 8,962 | Open hole |
| 7,504 | 7,669 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 944 | 12.25 | 250 S |
| 7 | 7,504 | 8.75 | 150 S |
| 2.375 | 7,530 | — | — |
| 9.625 | 9,444 | 12.25 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 20, 1992 | May 16, 1990 | Yes |
| 00 | Jan 27, 1992 | — | — |
| 00 | Jan 12, 1984 | Sep 27, 1982 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-177-31326 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-177-31326 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Nov 1996
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000082125 | W-14 Disposal | Plugged Sep 24, 1992 | 3,000 | 1,600 | 4,545–4,684 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17731326, documented in the API reference.