WELL · 42-177-31580 · DISTRICT 1
LBJ Dubose #1
Gonzales County · Peach Creek (Buda) field · Vertical
Lbj Dubose #1 (API 42-177-31580) is a plugged well in Gonzales County, plugged August 19, 1995, last operated by Lbj Oil & Gas Inc..
The RRC has issued 2 drilling permits between 1984 and 1986, permitted to 7,000 ft.
Completion filings report 3 formation tops, including Austin Chalk, Eagle Ford, Buda.
Its lease has reported 2.18K barrels of oil and 20 mcf of gas since January 1993, last reporting in August 2003.
Operator of record
Austin, TX · P-5 Y, filed Dec 4, 1992 · 6 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | LBJ Oil & Gas Inc. |
| Production reports | AV-Tech Resources Corporationthrough May 1995 |
| Latest permit | LBJ Oil & Gas, Inc.Jul 29, 1986 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,000
- total depth, ft
- 2
- permits on file
- Jul 29, 1986
- last permit issued
- Aug 1, 1985
- completed
- 2.18K
- cumulative oil, bbl
- 20
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 1, 1985
- Shut in
- —
- Plugged
- Aug 19, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dubose No. 1 O-1-11586 | Peach Creek (Austin Chalk) | AV-Tech Resources Corporation | 1 | 2.18K | 20 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1AV-Tech Resources CorporationJan 1993 → May 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 304716-99 | Recompletion | LBJ Oil & Gas, Inc. | Jun 6, 1986 | Jul 29, 1986 | — | 6,875 |
| 256483-99 | Drill | Four Way Energy, Inc. | Nov 1, 1984 | Nov 1, 1984 | Jul 19, 1985 | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-11586 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 364 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 6,390 | -6,026 |
| Eagle Ford | 6,754 | -6,390 |
| Austin ChalkUPPER (AUSTIN CHALK) | 6,754 | -6,390 |
| Buda | 6,805 | -6,441 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,365 | 6,401 | Perforated |
| 6,804 | 6,840 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,731 | 12.25 | 416 S |
| 5.5 | 6,875 | 7.875 | 170 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 20, 1986 | Feb 20, 1986 | Yes |
| 00 | Aug 12, 1986 | — | — |
| 00 | Aug 29, 1985 | Aug 12, 1985 | — |
| 00 | Aug 27, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-177-31580 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-177-31580 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17731580, documented in the API reference.