WELL · 42-177-31802 · DISTRICT 1

Boyden-Deacon Unit #1

Plugged

Gonzales County · Peach Creek (Austin Chalk) field  · Horizontal

Boyden-Deacon Unit #1 (API 42-177-31802) is a plugged horizontal well in Gonzales County, plugged May 3, 1993, last operated by Tdc Engineering Inc..

The RRC has issued one drilling permit (amended once), issued August 27, 1990, permitted to 10,475 ft.

Completion filings report one formation top, including Austin Chalk.

Its lease has reported 246 barrels of oil and 3 mcf of gas since January 1993, last reporting in July 1993. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

TDC Engineering Inc.

Abilene, TX · P-5 Active, filed Oct 16, 2025 · 227 permits on file · (325) 673-5024

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTDC Engineering Inc.
Production reportsTDC Engineering, Inc.through May 1993
Latest permitTDC Engineering, Inc.Aug 27, 1990
10,475
total depth, ft
2
permits on file
Aug 27, 1990
last permit issued
Jan 21, 1991
completed
246
cumulative oil, bbl
3
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 1993

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 21, 1991
Shut in
—
Plugged
May 3, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Boyden-Deacon Unit O-1-13020Peach Creek (Austin Chalk)TDC Engineering, Inc.22463Jan 1993 – Jul 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1TDC Engineering, Inc.Jan 1993 → May 1993

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
377119-98DrillTDC Engineering, Inc.Jan 28, 1991Aug 27, 1990—10,475
377119-99DrillTDC Engineering, Inc.Aug 27, 1990Aug 27, 1990Sep 3, 199010,475

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-13020————
—— O-1-13020————

Formation tops

As filed on W-2/G-1. Subsea from 290 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk7,305-7,015

Perforations

Perforated and open-hole intervals.

FromToType
7,5947,730Perforated
8,39510,328Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37576317.5630 S
9.6257,37412.25455 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 21, 1993Mar 18, 1993—
00Mar 16, 1993Feb 1, 1991Yes
00May 14, 1991Feb 1, 1991Yes
00May 6, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17731802, documented in the API reference.