WELL · 42-177-31815 · DISTRICT 1
Gonzales - Cantley #1
Gonzales County · Horizontal · Sidetrack
Gonzales - Cantley #1 (API 42-177-31815) is a permitted horizontal well in Gonzales County filed by Gibraltar Resources, Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits (amended twice) between 1990 and 1992, permitted to 12,500 ft.
Completion filings report 2 formation tops, including Anacacho, Austin Chalk.
Its 2 leases have reported 510 barrels of oil and 6 mcf of gas since January 1993, last reporting in August 2003.
Operator of record
Dallas, TX · P-5 Y, filed Oct 8, 1993 · 9 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Gibraltar Petroleum Corporationthrough Feb 1994 |
| Latest permit | Gibraltar Resources, Inc.Oct 1, 1992 |
- 12,500
- total depth, ft
- 4
- permits on file
- Oct 1, 1992
- last permit issued
- —
- completed
- 510
- cumulative oil, bbl
- 6
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gonzales-Cantley O-1-13448 | Pilgrim (Austin Chalk) | Gibraltar Petroleum Corporation | 1 | 510 | 6 | Jan 1993 – Aug 2003 |
| — O-1-12913 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Gibraltar Resources, Inc.Jun 1993 → Jun 1993
- 2Gibraltar Petroleum CorporationJul 1993 → Feb 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 404113-98 | Recompletion · sidetrack | Gibraltar Resources, Inc. | Jan 4, 1993 | Oct 1, 1992 | — | 12,000 |
| 404113-99 | Reenter | Gibraltar Resources, Inc. | Sep 30, 1992 | Oct 1, 1992 | — | 8,000 |
| 378991-98 | Drill | Texakoma Oil & Gas Corporation | Oct 15, 1990 | Oct 3, 1990 | — | 12,500 |
| 378991-99 | Drill | Texakoma Oil & Gas Corporation | Oct 3, 1990 | Oct 3, 1990 | Oct 8, 1990 | 12,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-12913 | — | — | — | — |
| — | — O-1-13448 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 317 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| AnacachoANACACHO LM | 7,202 | -6,885 |
| Austin Chalk | 7,323 | -7,006 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,800 | 7,850 | Open hole |
| 8,100 | 8,310 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,440 | 14.75 | 920 S |
| 7 | 7,162 | 9.875 | 380 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 9, 1992 | Jan 29, 1991 | Yes |
| 00 | Mar 22, 1991 | Jan 29, 1991 | Yes |
| 00 | Mar 18, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-177-31815 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-177-31815 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17731815, documented in the API reference.