WELL · 42-177-31832 · DISTRICT 1

Walters Ed. L.-Nelson #2

Plugged

Gonzales County · Peach Creek (Austin Chalk) field  · Horizontal

Walters ED. L.-Nelson #2 (API 42-177-31832) is a plugged horizontal well in Gonzales County, plugged August 8, 1994, last operated by Tiza Operating Company.

The RRC has issued one drilling permit, issued November 13, 1990, permitted to 12,500 ft.

It was permitted by Petro-Hunt Corporation and has since transferred to Tiza Operating Company on the wellbore schedule.

Completion filings report one formation top, including Austin Chalk.

Operator of record

Tiza Operating Company

Permitted by Petro-Hunt Corporation; the EWA schedule now lists a different operator.

Austin, TX · P-5 Y, filed Oct 4, 1996

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTiza Operating Company
Production reportsnone
Latest permitPetro-Hunt CorporationNov 13, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,500
total depth, ft
1
permits on file
Nov 13, 1990
last permit issued
Jan 18, 1991
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 1994

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 18, 1991
Shut in
—
Plugged
Aug 8, 1994

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Walters, Ed. L.-Nelson O-1-12825Peach Creek (Austin Chalk)Tiza Operating Company200Jan 1993 – Sep 1994

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
380987-99DrillPetro-Hunt CorporationNov 13, 1990Nov 13, 1990Nov 29, 199012,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-12825————

Formation tops

As filed on W-2/G-1. Subsea from 286 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk7,579-7,293

Perforations

Perforated and open-hole intervals.

FromToType
7,5657,603Perforated
7,57910,205Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7579512.25175 S
77,4758.751,120 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 18, 1991Feb 14, 1991Yes
00Jul 15, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17731832, documented in the API reference.