WELL · 42-179-31142 · DISTRICT 10
Bell #1R
Gray County · Panhandle Gray County Field field · Vertical
Bell #1R (API 42-179-31142) is a well in Gray County operated by Pantera Energy Company, completed May 17, 1982.
The RRC has issued 2 drilling permits between 1982 and 1998, permitted to 3,500 ft.
Completion filings report 3 formation tops, including Brown Dolo., Arkosic, Granite.
Its 4 leases have reported 1.52K barrels of oil and 258K mcf of gas since January 1993, last reporting in July 2026. The leases carry 8 wells, so these are lease totals, not this well alone.
Operator of record
Amarillo, TX · P-5 Y, filed Aug 4, 2025 · 359 permits on file · (806) 673-9438
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pantera Energy Company |
| Production reports | Pantera Energy Companythrough Apr 2026 |
| Latest permit | Pantera Energy CompanyFeb 9, 1998 |
- 3,500
- total depth, ft
- 2
- permits on file
- Feb 9, 1998
- last permit issued
- May 17, 1982
- completed
- 1.52K
- cumulative oil, bbl
- 258K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 17, 1982
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 8 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bell G-14-167910 | Panhandle, West | Pantera Energy Company | 1 | 0 | 258K | Mar 1998 – Jul 2026 |
| Lloyd O-14-5042 | Panhandle Gray County Field | Adobe Operating Company | 4 | 1.52K | 21 | Jan 1993 – Mar 2010 |
| Bell O-14-7240 | Panhandle Gray County Field | Pantera Energy Company | 1 | 0 | 0 | Dec 1997 – May 1998 |
| Alley O-14-5105 | Panhandle Gray County Field | Adobe Operating Company | 2 | 0 | 0 | Jan 1993 – Mar 1994 |
Gas, mcf lease total
Last 12 months 5,777 · prior 12 4,351(+33%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Adobe Operating CompanyJan 1993 → Feb 1996
- 2Pantera Energy CompanyMar 1998 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 473166-99 | Reclass | Pantera Energy Company | Feb 9, 1998 | Feb 9, 1998 | Apr 13, 1982 | 3,406 |
| 155615-99 | Drill | Panhandle Energy Corp. | Apr 5, 1982 | Apr 5, 1982 | Apr 12, 1982 | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-167910 | — | — | — | — |
| — | — O-14-5042 | — | — | — | — |
| — | — O-14-5105 | — | — | — | — |
| — | — O-14-7240 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,264 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolo. | 2,505 | 759 |
| Arkosic | 2,738 | 526 |
| Granite | 2,802 | 462 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,546 | 3,354 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 614 | 12.25 | 275 S |
| 2.375 | 3,324 | — | — |
| 5.5 | 3,406 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 27, 1998 | Mar 24, 1998 | Yes |
| 00 | May 12, 1998 | — | — |
| 00 | Feb 4, 1998 | Jun 3, 1982 | — |
| 00 | Dec 14, 1993 | Jun 3, 1982 | — |
| 00 | Jan 12, 1984 | Jun 3, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-179-31142 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-179-31142 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.