WELL · 42-179-31325 · DISTRICT 10
Cities Service Barrett #2
Gray County · Panhandle Gray County Field field · Vertical
Cities Service Barrett #2 (API 42-179-31325) is a well in Gray County operated by Pantera Energy Company, completed March 23, 1983.
The RRC has issued 2 drilling permits between 1982 and 2015, permitted to 3,546 ft.
Its 2 leases have reported 15.4K barrels of oil and 511K mcf of gas since January 1993, last reporting in July 2026. The leases carry 7 wells, so these are lease totals, not this well alone.
Operator of record
Amarillo, TX · P-5 Y, filed Aug 4, 2025 · 359 permits on file · (806) 673-9438
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pantera Energy Company |
| Production reports | Pantera Energy Companythrough Apr 2026 |
| Latest permit | Pantera Energy CompanyMay 8, 2015 |
- 3,546
- total depth, ft
- 2
- permits on file
- May 8, 2015
- last permit issued
- Mar 23, 1983
- completed
- 15.4K
- cumulative oil, bbl
- 511K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 23, 1983
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 7 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Barrett G-14-279785 | Panhandle, West | Pantera Energy Company | 1 | 0 | 52.6K | Apr 2015 – Jul 2026 |
| Cities Service Barrett O-14-5344 | Panhandle Gray County Field | Pantera Energy Company | 6 | 15.4K | 459K | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 8,738 · prior 12 2,727(+220%)
Oil, barrels lease total
Last 12 months 100 · prior 12 116(-14%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Dakar Operating CompanyJan 1993 → Feb 1995
- 2Dakar Operating Company, Inc.Mar 1995 → Mar 2000
- 3Pantera Energy CompanyApr 2000 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 806160-99 | Reclass | Pantera Energy Company | May 1, 2015 | May 8, 2015 | Dec 13, 1982 | 3,546 |
| 183762-99 | Drill | Dakkar Production Company | Dec 31, 1982 | Dec 31, 1982 | — | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-279785 | — | — | — | — |
| — | — O-14-5344 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,504 | 3,400 | Perforated |
| 2,504 | 3,400 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 640 | 11.5 | 275 S |
| 2.375 | 3,350 | — | — |
| 5.5 | 3,546 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 29, 2016 | May 20, 2015 | Yes |
| 00 | Jan 12, 1984 | Apr 4, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-179-31325 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-179-31325 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17931325, documented in the API reference.