WELL · 42-179-31398 · DISTRICT 10

Duncan Sec. 135 #1

N

Gray County · Panhandle Gray County Field field  · Vertical

Duncan Sec. 135 #1 (API 42-179-31398) is a well in Gray County operated by 6a Production, completed July 25, 1983.

The RRC has issued 2 drilling permits between 1983 and 1993, permitted to 3,600 ft.

It was permitted by Minco Oil & Gas CO. and has since transferred to 6a Production on the wellbore schedule.

Completion filings report 3 formation tops, including Panhandle Lime, Brown Dolomite, Granite Wash.

Its 2 leases have reported 5.48K barrels of oil and 156K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

6A Production

Permitted by Minco Oil & Gas Co.; the EWA schedule now lists a different operator.

Pampa, TX · P-5 Y, filed Oct 4, 2025 · (806) 664-1675

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedule6A Production
Production reports6A Productionthrough Apr 2026
Latest permitMinco Oil & Gas Co.Feb 9, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,600
total depth, ft
2
permits on file
Feb 9, 1993
last permit issued
Jul 25, 1983
completed
5.48K
cumulative oil, bbl
156K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 25, 1983
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Duncan -135- G-14-149030Panhandle, West6A Production10153KMar 1994 – Jul 2026
Duncan Sec. 135 O-14-5567Panhandle Gray County Field6A Production25.48K2.89KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 994 · prior 12 2,723(-63%)

0100200300202420252026

Oil, barrels lease total

Last 12 months 148 · prior 12 173(-14%)

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Minco Oil and Gas Co.Jan 1993 → Aug 2024
  2. 2Minco Oil and Gas Management,llcJul 2006 → Oct 2011
  3. 36A ProductionSep 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
403100-99OtherMinco Oil & Gas Co.Sep 3, 1992Feb 9, 1993Feb 14, 19943,500
196276-99DrillMobil Producing TX. & N.M. Inc.May 25, 1983May 25, 1983—3,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-149030————
—— O-14-5567————
—— O-14-5567————

Formation tops

As filed on W-2/G-1. Subsea from 3,265 ft elevation.Download CSV →

FormationMD ftSubsea
Panhandle Lime1,9101,355
Brown Dolomite2,522743
Brown Dolomite2,560705
Granite Wash2,740525
Granite Wash2,764501

Perforations

Perforated and open-hole intervals.

FromToType
2,5222,740Perforated
2,7523,456Perforated
2,7823,456Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62563912.25450 S
2.3753,417——
5.53,5007.875225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 29, 1994Apr 28, 1994—
00Jun 14, 1994Apr 28, 1994Yes
00Jun 9, 1994Jan 4, 1984—
00May 9, 1994——
00Jan 30, 1984Jan 4, 1984—
00Jan 12, 1984Jan 4, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17931398, documented in the API reference.