WELL · 42-179-31630 · DISTRICT 10
Fern Fannie #1
Gray County · Panhandle Gray County Field field · Vertical
Fern Fannie #1 (API 42-179-31630) is a plugged well in Gray County, plugged January 13, 2004, last operated by N And T Productions.
The RRC has issued one drilling permit, issued April 6, 1984, permitted to 3,650 ft.
It was permitted by El Ran Inc. and has since transferred to N And T Productions on the wellbore schedule.
Completion filings report 3 formation tops, including Brown Dolomite, Arkosic Dolomite, Granite Wash.
Operator of record
Permitted by EL Ran Inc.; the EWA schedule now lists a different operator.
Pampa, TX · P-5 Y, filed May 7, 2004
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | N and T Productions |
| Production reports | none |
| Latest permit | EL Ran Inc.Apr 6, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,650
- total depth, ft
- 1
- permits on file
- Apr 6, 1984
- last permit issued
- May 16, 1987
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 16, 1987
- Shut in
- —
- Plugged
- Jan 13, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Fern, Fannie O-14-5773 | Panhandle Gray County Field | N and T Productions | 1 | 0 | 0 | Jan 1993 – Mar 2008 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 234831-99 | Drill | EL Ran Inc. | Apr 4, 1984 | Apr 6, 1984 | Apr 24, 1984 | 3,650 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-5773 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,292 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 3,016 | 276 |
| Arkosic Dolomite | 3,268 | 24 |
| Granite Wash | 3,328 | -36 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,298 | 3,428 | Perforated |
| 3,343 | 3,428 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 685 | 12.25 | 330 S |
| 4.5 | 3,573 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 5, 1987 | May 19, 1987 | — |
| 00 | Jun 6, 1984 | May 22, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-179-31630 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-179-31630 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 12.5K
- bbl, last 12 reported months
- 203K
- bbl, all reported
- Jun 2001
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000062550 | H-1 Injection | Plugged Feb 13, 2004 | 100 | 200 | 3,298–3,428 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 12,500 · prior 12 32,840(-62%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17931630, documented in the API reference.