WELL · 42-179-31896 · DISTRICT 10

Parker Fee -A- #55

Plugged

Gray County · Panhandle Gray County Field field  · Vertical

Parker Fee -A- #55 (API 42-179-31896) is a plugged well in Gray County, plugged October 11, 1988, last operated by O.G.P. Operating Inc..

The RRC has issued one drilling permit, issued October 6, 1987, permitted to 3,000 ft.

It was permitted by Beta-Tex, AN Oklahoma Corp. and has since transferred to O.G.P. Operating Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Brown Dolomite, Arkosic, Granite Wash.

Operator of record

O.G.P. Operating Inc.

Permitted by Beta-Tex, AN Oklahoma Corp.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Sep 4, 2025 · 39 permits on file · (800) 362-2393

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleO.G.P. Operating Inc.
Production reportsnone
Latest permitBeta-Tex, AN Oklahoma Corp.Oct 6, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,000
total depth, ft
1
permits on file
Oct 6, 1987
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Oct 11, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
336754-99DrillBeta-Tex, AN Oklahoma Corp.Oct 1, 1987Oct 6, 1987—3,000

Formation tops

As filed on W-2/G-1. Subsea from 2,892 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite2,438454
Arkosic2,598294
Granite Wash2,642250

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62534513.5240 S
72,7948.75100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 13, 1988Apr 1, 1988Yes
00Apr 11, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17931896, documented in the API reference.