WELL · 42-179-31992 · DISTRICT 10
Morse Waterflood Project #1A
Gray County · Panhandle Gray County Field field · Horizontal
Morse Waterflood Project #1A (API 42-179-31992) is a horizontal well in Gray County operated by Bradley Operating CO., completed October 16, 1990.
The RRC has issued one drilling permit, issued May 15, 1990, permitted to 4,292 ft.
Completion filings report 3 formation tops, including Brown Dolomite, Arkosic Dolomite, Granite Wash.
Its lease has reported 118K barrels of oil and 68.3K mcf of gas since January 1993, last reporting in July 2026. The lease carries 69 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 10K barrels injected in the 12 months reported through June 2025.
Operator of record
Pampa, TX · P-5 Y, filed Dec 4, 2025 · 28 permits on file · (806) 665-7128
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bradley Operating Co. |
| Production reports | Bradley Operating Co.through Apr 2026 |
| Latest permit | Bradley Operating Co.May 15, 1990 |
- 4,292
- total depth, ft
- 1
- permits on file
- May 15, 1990
- last permit issued
- Oct 16, 1990
- completed
- 118K
- cumulative oil, bbl
- 68.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 16, 1990
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 69 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Morse Waterflood Project O-14-1662 | Panhandle Gray County Field | Bradley Operating Co. | 69 | 118K | 68.3K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 621 · prior 12 602(+3%)
Gas, mcf lease total
Last 12 months 275 · prior 12 786(-65%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bradley Operating Co.Jan 1993 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 373347-99 | Drill | Bradley Operating Co. | May 15, 1990 | May 15, 1990 | — | 4,292 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-1662 | — | — | — | — |
| — | — O-14-1662 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,670 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 2,598 | 72 |
| Arkosic Dolomite | 2,650 | 20 |
| Granite Wash | 2,700 | -30 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,598 | 2,682 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,104 | 14.75 | 935 S |
| 5.5 | 2,840 | 7.875 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 22, 1992 | Mar 21, 1992 | — |
| 00 | Mar 30, 1992 | Nov 20, 1990 | Yes |
| 00 | Mar 25, 1992 | Nov 20, 1990 | Yes |
| 00 | Mar 11, 1992 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-179-31992 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-179-31992 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 10K
- bbl, last 12 reported months
- 374K
- bbl, all reported
- Jun 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000074575 | H-1 Injection | Active | 1,000 | 1,290 | 2,589–2,682 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 10,000 · prior 12 10,000(+0%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/17931992, documented in the API reference.