WELL · 42-179-83948 · DISTRICT 10

Morse Waterflood Project #19

Y

Gray County · Panhandle Gray County Field field · Producing  · Horizontal · Sidetrack

Morse Waterflood Project #19 (API 42-179-83948) is a horizontal well in Gray County operated by Bradley Operating CO., completed October 16, 1990 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 15, 1990, permitted to 2,622 ft.

Completion filings report 3 formation tops, including Brown Dolomite, Arkosic Dolomite, Granite Wash.

Its lease has reported 118K barrels of oil and 68.3K mcf of gas since January 1993, last reporting in July 2026. The lease carries 69 wells, so these are lease totals, not this well alone.

Operator of record

Bradley Operating Co.

Pampa, TX · P-5 Y, filed Dec 4, 2025 · 28 permits on file · (806) 665-7128

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBradley Operating Co.
Production reportsBradley Operating Co.through Apr 2026
Latest permitBradley Operating Co.Jun 15, 1990
2,622
total depth, ft
1
permits on file
Jun 15, 1990
last permit issued
Oct 16, 1990
completed
118K
cumulative oil, bbl
68.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 16, 1990
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 69 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Morse Waterflood Project O-14-1662Panhandle Gray County FieldBradley Operating Co.69118K68.3KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 621 · prior 12 602(+3%)

0100200202420252026

Gas, mcf lease total

Last 12 months 275 · prior 12 786(-65%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bradley Operating Co.Jan 1993 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
373544-99Recompletion · sidetrackBradley Operating Co.May 18, 1990Jun 15, 1990Jul 30, 19902,622

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-1662————

Formation tops

As filed on W-2/G-1. Subsea from 2,585 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite2,51867
Arkosic Dolomite2,598-13
Granite Wash2,622-37

Perforations

Perforated and open-hole intervals.

FromToType
2,4822,622Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
15.53017—
12.525015.5—
8.251,67812.5—
72,4828.2535 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 14, 1992Nov 28, 1990—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17983948, documented in the API reference.