WELL · 42-181-30597 · DISTRICT 9
Hunt Maggie #2
Grayson County · Collinsville SE. (3950 Sand) field · Vertical
Hunt Maggie #2 (API 42-181-30597) is a plugged well in Grayson County, plugged June 25, 1990, last operated by Snuggs Oil Company.
The RRC has issued 2 drilling permits between 1977 and 2011, permitted to 4,000 ft.
It was permitted by Bls Production CO., Inc. and has since transferred to Snuggs Oil Company on the wellbore schedule.
Completion filings report one formation top, including Sand.
Its 2 leases have reported 16.8K barrels of oil since May 2011, last reporting in July 2026.
Operator of record
Permitted by BLS Production Co., Inc.; the EWA schedule now lists a different operator.
Gainesville, TX · P-5 Y, filed Nov 8, 2002 · 12 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Snuggs Oil Company |
| Production reports | BLS Production Co., Inc.through Apr 2026 |
| Latest permit | BLS Production Co., Inc.Apr 5, 2011 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 2
- permits on file
- Apr 5, 2011
- last permit issued
- Dec 27, 1977
- completed
- 16.8K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 27, 1977
- Shut in
- —
- Plugged
- Jun 25, 1990
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Maggie Hunt O-13-31872 | Collinsville, SE. (3950 Sand) | BLS Production Co., Inc. | 1 | 16.8K | 0 | May 2011 – Jul 2026 |
| — O-13-18670 | — | — | 0 | 0 | 0 | — |
Oil, barrels lease total
Last 12 months 1,557 · prior 12 1,385(+12%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1BLS Production Co., Inc.Jul 2011 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 712863-99 | Reenter | BLS Production Co., Inc. | Mar 25, 2011 | Apr 5, 2011 | May 26, 2011 | 3,937 |
| 9966-99 | Drill | Snuggs, Fred | Oct 17, 1977 | Oct 17, 1977 | — | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-18670 | — | — | — | — |
| — | — O-13-31872 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,928 | 3,937 | Open hole |
| — | 3,937 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 135 | 12.25 | 95 S |
| 8.625 | 135 | 12.5 | 95 S |
| 4.5 | 3,928 | 7.875 | 800 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 7, 2011 | Jun 6, 2011 | — |
| 00 | Jan 12, 1984 | Jan 4, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-181-30597 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-181-30597 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/18130597, documented in the API reference.