WELL · 42-181-30670 · DISTRICT 9

McAden E. W. #8

N

Grayson County · Philpick (6450) field  · Vertical

Mcaden E. W. #8 (API 42-181-30670) is a well in Grayson County operated by Tatanka Operating LLC, completed April 24, 1982.

The RRC has issued one drilling permit, issued April 13, 1979, permitted to 7,600 ft.

It was permitted by Amis, William J. and has since transferred to Tatanka Operating LLC on the wellbore schedule.

Its 2 leases have reported 15.6K barrels of oil and 31 mcf of gas since January 1993, last reporting in July 2026. The leases carry 8 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 10.9K barrels injected in the 12 months reported through September 2025.

Operator of record

Tatanka Operating LLC

Permitted by Amis, William J.; the EWA schedule now lists a different operator.

Whitesboro, TX · P-5 Y, filed May 4, 2026 · (940) 736-3129

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTatanka Operating LLC
Production reportsAtoka Operating, Inc.through May 2018
Latest permitAmis, William J.Apr 13, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,600
total depth, ft
1
permits on file
Apr 13, 1979
last permit issued
Apr 24, 1982
completed
15.6K
cumulative oil, bbl
31
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 24, 1982
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McAden, E. W. O-13-18788Philpick (6450)Tatanka Operating, LLC62.68K11Jan 1993 – Jul 2026
McAden, E. W. O-13-19434Philpick (Riverside)Tatanka Operating, LLC212.9K20Jan 1993 – Aug 2024

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Brammer Supply, Inc.Jan 1993 → Oct 2001
  2. 2Hep Oil Company, Ltd.Nov 2001 → Jun 2005
  3. 3D-S-B Properties, Inc.Jul 2005 → Nov 2010
  4. 4Atoka Operating, Inc.Dec 2010 → May 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
46409-99DrillAmis, William J.Apr 13, 1979Apr 13, 1979Apr 9, 19797,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-18788————
—— O-13-18788————
—— O-13-19434————

Perforations

Perforated and open-hole intervals.

FromToType
4,9824,990Perforated
6,5486,564Perforated
—4,990Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62530012.25250 S
8.625300—550 S
2.3756,486——
5.56,6277.875880 S
5.56,627—880 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 10, 1992Feb 17, 1989—
00Apr 20, 1989Feb 17, 1989—
00Mar 14, 1989Feb 17, 1989—
00Jan 12, 1984Dec 6, 1982—
00Jan 12, 1984Oct 23, 1979—
00Jan 12, 1984Jul 16, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

10.9K
bbl, last 12 reported months
4.58M
bbl, all reported
Sep 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000033663H-1 InjectionActive4003,5006,548–6,564
000045191H-1 InjectionCanceled Mar 12, 1992000–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 10,896 · prior 12 22,560(-52%)

05K10K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18130670, documented in the API reference.