WELL · 42-181-30968 · DISTRICT 9

Collins #2

N

Grayson County · Two Eds (Hester Sand) field  · Vertical

Collins #2 (API 42-181-30968) is a well in Grayson County operated by Spence Energy Company, completed January 8, 1987.

The RRC has issued one drilling permit, issued June 24, 1983, permitted to 5,800 ft.

Completion filings report 2 formation tops, including Strawn, Hester Sand.

Its 2 leases have reported 153K barrels of oil and 385 mcf of gas since January 1993, last reporting in July 2026. The leases carry 10 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 35.8K barrels injected in the 12 months reported through September 2025.

Operator of record

Spence Energy Company

Dallas, TX · P-5 Y, filed May 4, 2026 · 96 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSpence Energy Company
Production reportsFelderhoff Production Companythrough Apr 2026
Latest permitSpence Energy CompanyJun 24, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,800
total depth, ft
1
permits on file
Jun 24, 1983
last permit issued
Jan 8, 1987
completed
153K
cumulative oil, bbl
385
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 8, 1987
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Two Eds Unit O-13-29129Two Eds (Hester Sand)Felderhoff Production Company7152K365Jan 1996 – Jul 2026
Collins O-13-22753Two Eds (Hester Sand)Spence Energy Company31.06K20Jan 1993 – Jul 1996

Oil, barrels lease total

Last 12 months 1,126 · prior 12 1,305(-14%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Spence Energy CompanyJan 1993 → Aug 1999
  2. 2Felderhoff Production CompanySep 1999 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
199820-99DrillSpence Energy CompanyJun 24, 1983Jun 24, 1983—5,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-22753————
—— O-13-29129————

Formation tops

As filed on W-2/G-1. Subsea from 740 ft elevation.Download CSV →

FormationMD ftSubsea
StrawnSTRAWN SAND4,400-3,660
Hester Sand5,656-4,916

Perforations

Perforated and open-hole intervals.

FromToType
4,4104,430Perforated
4,4784,488Perforated
4,5154,520Perforated
5,6585,678Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62520512.25165 S
5.55,6587.875900 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 11, 2009Nov 4, 2008—
00Nov 8, 1999Sep 22, 1999—
00Nov 23, 1998Oct 29, 1998—
00May 29, 1996Jan 20, 1987Yes
00Feb 17, 1987Jan 20, 1987—
00Jan 12, 1984Sep 19, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

35.8K
bbl, last 12 reported months
1.22M
bbl, all reported
Sep 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000061494W-14 DisposalActive1,0002,2004,400–4,520

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 35,770 · prior 12 34,675(+3%)

02K4K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18130968, documented in the API reference.