WELL · 42-181-31051 · DISTRICT 9

Floyd Lillie #2

Y

Grayson County · Collinsville East (Strawn 3600) field · Injection  · Vertical

Floyd Lillie #2 (API 42-181-31051) is a well in Grayson County operated by Grayson Petroleum Company, completed May 8, 2004 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued May 1, 1984, permitted to 4,300 ft.

Completion filings report 2 formation tops, including Strawn, Collinsville, East (Strawn 2750,.

Its lease has reported 3.21K barrels of oil and 17 mcf of gas since January 1993, last reporting in July 2026.

It holds an active disposal or injection permit, with 8.72K barrels injected in the 12 months reported through September 2025.

Operator of record

Grayson Petroleum Company

Whitesboro, TX · P-5 Y, filed Feb 4, 2026 · 124 permits on file · (903) 267-1127

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGrayson Petroleum Company
Production reportsSeitz, J. R. & Adamthrough Oct 1997
Latest permitGrayson Petroleum CompanyMay 1, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,300
total depth, ft
1
permits on file
May 1, 1984
last permit issued
May 8, 2004
completed
3.21K
cumulative oil, bbl
17
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 8, 2004
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Floyd, Lillie O-13-24412Collinsville, East (Strawn 3600)Grayson Petroleum Company13.21K17Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Maverick ProductionJan 1993 → Apr 1997
  2. 2Seitz, J. R. & AdamAug 1997 → Oct 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
237248-99DrillGrayson Petroleum CompanyApr 4, 1984May 1, 1984May 8, 19844,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-24412————

Formation tops

As filed on W-2/G-1. Subsea from 682 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn3,718-3,036
Collinsville, East (Strawn 2750,4,110-3,428

Perforations

Perforated and open-hole intervals.

FromToType
2,9503,300Perforated
3,7183,722Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62511312.25100 S
811312.25100 S
4.52,9007.875350 S
4.54,0167.875650 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 13, 2022Jan 19, 2022—
00Aug 4, 2004Jun 7, 2004—
00Jul 19, 1984Jul 2, 1984—
00Jul 10, 1984Jul 2, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

8.72K
bbl, last 12 reported months
324K
bbl, all reported
Sep 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000087904W-14 DisposalActive8001,4752,950–3,300

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 8,720 · prior 12 8,400(+4%)

05001K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18131051, documented in the API reference.