WELL · 42-181-31323 · DISTRICT 9

Green #45

N

Grayson County  · Directional

Green #45 (API 42-181-31323) is a permitted well in Grayson County filed by Blackwell Bmc, LLC; no completion report is on file yet.

The RRC has issued 3 drilling permits (amended once) between 1997 and 2010, permitted to 9,850 ft.

Completion filings report 4 formation tops, including U Sand, V Sand, Woodford, Viola.

Its 2 leases have reported 546K barrels of oil and 5.36M mcf of gas since September 1997, last reporting in July 2026. The leases carry 6 wells, so these are lease totals, not this well alone.

Operator of record

Blackwell BMC, LLC

Dallas, TX · P-5 Y, filed Jan 4, 2026 · 15 permits on file · (469) 222-5536

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsFlintlock Exploration, LLCthrough Apr 2026
Latest permitBlackwell BMC, LLCJun 16, 2010
9,850
total depth, ft
4
permits on file
Jun 16, 2010
last permit issued
—
completed
546K
cumulative oil, bbl
5.36M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Green O-13-29412Big Mineral Creek (Viola)Flintlock Exploration, LLC4497K4.11MSep 1997 – Jul 2026
Green O-13-31684Big Mineral Creek (Woodford)Flintlock Exploration, LLC248.7K1.25MMar 2010 – Jul 2026

Gas, mcf lease total

Last 12 months 29,707 · prior 12 30,671(-3%)

02K4K202420252026

Oil, barrels lease total

Last 12 months 1,971 · prior 12 1,403(+40%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Venoco, Inc.Sep 1997 → Mar 2005
  2. 2Blackwell BMC, LPApr 2005 → Mar 2007
  3. 3Blackwell BMC, LLCApr 2007 → May 2011
  4. 4Jetta Operating Company, Inc.Jun 2011 → Aug 2025
  5. 5Flintlock Exploration, LLCSep 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
697676-99RecompletionBlackwell BMC, LLCJun 15, 2010Jun 16, 2010Feb 16, 20109,850
690286-99RecompletionBlackwell BMC, LLCJan 25, 2010Jan 27, 2010Feb 16, 20109,850
467901-98DrillVenoco, Inc.Apr 10, 1998Sep 22, 1997Sep 29, 19979,850
467901-99DrillVenoco, Inc.Sep 22, 1997Sep 22, 1997—9,850

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-29412————
—— O-13-31684————

Formation tops

As filed on W-2/G-1. Subsea from 653 ft elevation.Download CSV →

FormationMD ftSubsea
U Sand6,258-5,605
V Sand6,550-5,897
Woodford8,032-7,379
Woodford8,050-7,397
Viola8,430-7,777

Perforations

Perforated and open-hole intervals.

FromToType
8,0329,766Perforated
8,4718,836Perforated
8,8679,766Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,62014.75830 S
8.755,2509.8751,580 S
5.59,8507.875410 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 4, 2011Jan 26, 2011—
00Nov 30, 2010Aug 26, 2010—
00Nov 17, 2010——
00Sep 1, 1998Apr 24, 1998Yes
00Aug 20, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18131323, documented in the API reference.