WELL · 42-181-31415 · DISTRICT 9
R-H Unit #1
Grayson County · Sandusky West (Strawn North) field · Vertical
R-H Unit #1 (API 42-181-31415) is a plugged well in Grayson County, plugged November 20, 2019, last operated by Ginnings Company.
The RRC has issued one drilling permit, issued July 21, 2006, permitted to 6,350 ft.
Completion filings report 3 formation tops, including Buckley Lime, Foster Sand, Dornick Hills Lime.
Its lease has reported 645 barrels of oil since November 2006, last reporting in April 2020.
Operator of record
Wichita Falls, TX · P-5 Y, filed May 4, 2026 · 67 permits on file · (940) 322-7829
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ginnings Company |
| Production reports | Ginnings Companythrough Oct 2007 |
| Latest permit | Ginnings CompanyJul 21, 2006 |
- 6,350
- total depth, ft
- 1
- permits on file
- Jul 21, 2006
- last permit issued
- Nov 8, 2007
- completed
- 645
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2006 THROUGH Apr 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 8, 2007
- Shut in
- —
- Plugged
- Nov 20, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| R-H Unit O-13-30725 | Sandusky, West (Strawn North) | Ginnings Company | 1 | 645 | 0 | Nov 2006 – Apr 2020 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Ginnings CompanyNov 2006 → Oct 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 622675-99 | Drill | Ginnings Company | Jul 15, 2006 | Jul 21, 2006 | Sep 9, 2006 | 6,350 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-30725 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 791 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Buckley Lime | 3,260 | -2,469 |
| Foster Sand | 6,222 | -5,431 |
| Dornick Hills Lime | 6,350 | -5,559 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,224 | 6,244 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,518 | 12.25 | 750 S |
| 4.5 | 6,350 | 7.875 | 235 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 13, 2008 | Nov 26, 2007 | — |
| 00 | May 3, 2007 | Nov 8, 2006 | Yes |
| 00 | Feb 27, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-181-31415 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-181-31415 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 39.8K
- bbl, last 12 reported months
- 1.4M
- bbl, all reported
- Sep 2019
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000097716 | H-1 Injection | Plugged Dec 16, 2019 | 500 | 2,000 | 6,224–6,244 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 39,758 · prior 12 56,866(-30%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/18131415, documented in the API reference.