WELL · 42-181-31447 · DISTRICT 9
Calhoun J. M. #2
Grayson County · Southmayd North (Baker-Viola) field · Vertical
Calhoun J. M. #2 (API 42-181-31447) is a plugged well in Grayson County, plugged October 7, 2021, last operated by Felderhoff Production Company.
The RRC has issued one drilling permit (amended once), issued October 9, 2008, permitted to 8,525 ft.
It was permitted by Jaco, Troy Inc. and has since transferred to Felderhoff Production Company on the wellbore schedule.
Completion filings report 2 formation tops, including Baker Sandstone, Viola.
Its lease has reported 687 barrels of oil since July 2009, last reporting in December 2021.
Operator of record
Permitted by Jaco, Troy Inc.; the EWA schedule now lists a different operator.
Muenster, TX · P-5 Y, filed Jan 4, 2026 · 468 permits on file · (940) 768-9791
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Felderhoff Production Company |
| Production reports | Jaco, Troy Inc.through Feb 2010 |
| Latest permit | Jaco, Troy Inc.Oct 9, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,525
- total depth, ft
- 2
- permits on file
- Oct 9, 2008
- last permit issued
- Jul 13, 2009
- completed
- 687
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2009 THROUGH Dec 2021
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 13, 2009
- Shut in
- —
- Plugged
- Oct 7, 2021
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Calhoun, J. M. O-13-31432 | Southmayd, North (Baker-Viola) | Felderhoff Production Company | 1 | 687 | 0 | Jul 2009 – Dec 2021 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Jaco, Troy Inc.Jul 2009 → Feb 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 671121-98 | Drill | Jaco, Troy Inc. | Jul 16, 2009 | Oct 9, 2008 | Feb 21, 2009 | 8,525 |
| 671121-99 | Drill | Jaco, Troy Inc. | Sep 12, 2008 | Oct 9, 2008 | Feb 21, 2009 | 8,450 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-31432 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 871 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Baker Sandstone | 7,386 | -6,515 |
| ViolaVIOLA LIMESTONE | 8,278 | -7,407 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,278 | 8,410 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,488 | 12.25 | 890 S |
| 5.5 | 8,500 | 7.875 | 325 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 29, 2010 | Mar 22, 2010 | — |
| 00 | Feb 2, 2010 | Jul 30, 2009 | Yes |
| 00 | Nov 10, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-181-31447 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-181-31447 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/18131447, documented in the API reference.