WELL · 42-181-31513 · DISTRICT 9

Shelton Unit #2

N

Grayson County · Dorchester (Davis Sand) field  · Horizontal

Shelton Unit #2 (API 42-181-31513) is a horizontal well in Grayson County operated by Bkm Production, completed August 1, 2013.

The RRC has issued 2 drilling permits between 2012 and 2014, permitted to 8,700 ft.

It was permitted by Slawson Exploration Company, Inc and has since transferred to Bkm Production on the wellbore schedule.

Completion filings report 14 formation tops, including Baker Ss, Atoka, Davis, Mclish.

Its lease has reported 22.6K barrels of oil since May 2013, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

BKM Production

Permitted by Slawson Exploration Company, Inc; the EWA schedule now lists a different operator.

Gainesville, TX · P-5 Y, filed Mar 4, 2026 · 5 permits on file · (940) 668-8632

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBKM Production
Production reportsBKM Productionthrough Apr 2026
Latest permitSlawson Exploration Company, IncJul 3, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,700
total depth, ft
2
permits on file
Jul 3, 2014
last permit issued
Aug 1, 2013
completed
22.6K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 1, 2013
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Shelton Unit O-13-32662Dorchester (Davis Sand)BKM Production222.6K0May 2013 – Jul 2026

Oil, barrels lease total

Last 12 months 393 · prior 12 255(+54%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Slawson Exploration Company, IncMay 2013 → Oct 2014
  2. 2Bend Petroleum Corp.Nov 2014 → Nov 2023
  3. 3Kodiak Oil & Gas, Inc.Dec 2023 → Jun 2024
  4. 4BKM ProductionJul 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
784859-99RecompletionSlawson Exploration Company, IncApr 16, 2014Jul 3, 2014Jul 10, 20148,700
750885-99DrillSlawson Exploration Company, IncNov 2, 2012Nov 6, 2012Nov 20, 20127,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-32662————
—— O-13-32662————

Formation tops

As filed on W-2/G-1. Subsea from 885 ft elevation.Download CSV →

FormationMD ftSubsea
Baker SS6,080-5,195
Atoka6,450-5,565
Davis6,570-5,685
McLish6,686-5,801
Baker Sand——
Barnes Sand——
Bruhlmeyer——
Carraway Sand——
Covey——
Davis Sand——
Handy Sand——
Huff Sand——
Paluxy——
Strawn——

Perforations

Perforated and open-hole intervals.

FromToType
6,2246,234Perforated
6,5756,644Perforated
6,7157,660Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,54012.25700 S
76,8008.75300 S
4.57,7096.125200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 9, 2015Oct 3, 2013Yes
00Nov 17, 2014Oct 21, 2014Yes
00Oct 15, 2013Oct 3, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18131513, documented in the API reference.