WELL · 42-181-31547 · DISTRICT 9

Elaine #1

N

Grayson County · Southmayd North (Baker-Viola) field  · Vertical

Elaine #1 (API 42-181-31547) is a well in Grayson County operated by Tatanka Operating LLC, completed September 8, 2019.

The RRC has issued one drilling permit (amended once), issued March 27, 2014, permitted to 15,500 ft.

It was permitted by Payson Operating, LLC and has since transferred to Tatanka Operating LLC on the wellbore schedule.

Completion filings report 12 formation tops, including Baker Sand, Davis Sand, Barnes Sand, Bruhlmeyer.

Its 2 leases have reported 21.5K barrels of oil and 211K mcf of gas since May 2014, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Tatanka Operating LLC

Permitted by Payson Operating, LLC; the EWA schedule now lists a different operator.

Whitesboro, TX · P-5 Y, filed May 4, 2026 · (940) 736-3129

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTatanka Operating LLC
Production reportsTatanka Operating, LLCthrough Apr 2026
Latest permitPayson Operating, LLCMar 27, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,500
total depth, ft
2
permits on file
Mar 27, 2014
last permit issued
Sep 8, 2019
completed
21.5K
cumulative oil, bbl
211K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 8, 2019
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Elaine G-13-289815Southmayd, North (Baker-Viola)Tatanka Operating, LLC1080.7KMar 2020 – Jul 2026
Elaine O-13-33061Southmayd, North (Baker-Viola)Tatanka Operating, LLC121.5K131KMay 2014 – Oct 2020

Gas, mcf lease total

Last 12 months 939 · prior 12 1,712(-45%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Payson Operating, LLCSep 2014 → Mar 2018
  2. 2Tatanka Operating, LLCApr 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
782643-98DrillPayson Operating, LLCAug 22, 2014Mar 27, 2014Apr 7, 201415,500
782643-99DrillPayson Operating, LLCMar 19, 2014Mar 27, 2014Apr 7, 201415,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-289815————
—— O-13-33061————

Formation tops

As filed on W-2/G-1. Subsea from 680 ft elevation.Download CSV →

FormationMD ftSubsea
Baker Sand7,325-6,645
Davis Sand8,240-7,560
Barnes Sand——
Bruhlmeyer——
Carraway Sand——
Covey——
Dornick Hills——
Handy Sand——
Huff Sand——
Paluxy——
Strawn——
"V" Sand——

Perforations

Perforated and open-hole intervals.

FromToType
7,3327,368Perforated
10,08511,265Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
12.251,3949.625600 S
9.6251,39412.25600 S
8.7513,1045.51,200 S
5.513,1048.751,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 9, 2020Mar 18, 2020—
00Jan 31, 2020Sep 12, 2019—
00Nov 19, 2014Oct 14, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18131547, documented in the API reference.