WELL · 42-181-31640 · DISTRICT 9

McConnell #1

Y

Grayson County · Mackoy (Strawn) field · Producing  · Vertical

Mcconnell #1 (API 42-181-31640) is a well in Grayson County operated by Felderhoff Production Company, completed August 26, 2024 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued April 3, 2024, permitted to 5,500 ft.

Completion filings report 10 formation tops, including Strawn, Baker Sand, Barnes Sand, Bruhlmeyer.

Its lease has reported 705 barrels of oil since August 2024, last reporting in July 2026.

Operator of record

Felderhoff Production Company

Muenster, TX · P-5 Y, filed Jan 4, 2026 · 468 permits on file · (940) 768-9791

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFelderhoff Production Company
Production reportsFelderhoff Production Companythrough Apr 2026
Latest permitFelderhoff Production CompanyApr 3, 2024
5,500
total depth, ft
1
permits on file
Apr 3, 2024
last permit issued
Aug 26, 2024
completed
705
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2024 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 26, 2024
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

33.598400, -96.838680

OpenStreetMap → ·  Google Maps →

Permit surface location from the RRC GIS record, in Grayson County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McConnell O-13-34333Mackoy (Strawn)Felderhoff Production Company17050Aug 2024 – Jul 2026

Oil, barrels lease total

Last 12 months 535 · prior 12 170(+215%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Felderhoff Production CompanyAug 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
898348-99DrillFelderhoff Production CompanyMar 25, 2024Apr 3, 2024Apr 5, 20245,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-34333————

Formation tops

As filed on W-2/G-1. Subsea from 739 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn5,357-4,618
Baker Sand——
Barnes Sand——
Bruhlmeyer——
Carraway Sand——
Covey——
Davis Sand——
Handy Sand——
Huff Sand——
Paluxy——

Perforations

Perforated and open-hole intervals.

FromToType
5,3575,366Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512912.25100 S
5.55,4997.875515 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 6, 2024Aug 30, 2024Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

Butler, Tip42-181-31617

1.2 KM · Felderhoff Production Company · Section with this well →

Strawn4,602-3,851
Baker Sand—
Carraway Sand—
Covey—
Davis Sand—
Handy Sand—
Huff Sand—
Paluxy—

10 TOPS · FIRST 8

Robwright Unit42-181-31613

1.2 KM · Felderhoff Production Company · Section with this well →

Strawn4,200-3,447
Baker Sand—
Barnes Sand—
Bruhlmeyer—
Carraway Sand—
Covey—
Davis Sand—
Handy Sand—

10 TOPS · FIRST 8

Lime Rock42-181-31625

3.9 KM · Bend Petroleum Corp. · Section with this well →

Paluxy840-89
Strawn2,052-1,301
Bruhlmeyer2,470-1,719
Davis Sand—
Handy Sand—
Barnes Sand—
Huff Sand—
Carraway Sand—

10 TOPS · FIRST 8

Lime Rock42-181-31614

4.1 KM · Bend Petroleum Corp. · Section with this well →

Paluxy840-86
Strawn2,052-1,298
Bruhlmeyer2,470-1,716
Baker Sand—
Barnes Sand—
Carraway Sand—
Covey—
Davis Sand—

10 TOPS · FIRST 8

Varley42-181-31623

4.1 KM · Felderhoff Production Company · Section with this well →

Paluxy850-95
Handy Sand2,400-1,645
Strawn3,150-2,395
Barnes Sand—
Carraway Sand—
Bruhlmeyer—
Baker Sand—
Huff Sand—

10 TOPS · FIRST 8

Erwin42-181-31609

4.3 KM · Bend Petroleum Corp. · Section with this well →

Paluxy857-100
Handy Sand2,403-1,646
Strawn3,150-2,393
Barnes Sand—
Baker Sand—
Huff Sand—
Davis Sand—
Covey—

10 TOPS · FIRST 8

Erwin42-181-31620

4.3 KM · Bend Petroleum Corp. · Section with this well →

Paluxy806-56
Strawn2,056-1,306
Bruhlmeyer2,490-1,740
Carraway Sand—
Barnes Sand—
Baker Sand—
Covey—
Davis Sand—

10 TOPS · FIRST 8

Erwin42-181-31615

4.5 KM · Bend Petroleum Corp. · Section with this well →

Paluxy806-48
Strawn2,056-1,298
Bruhlmeyer2,490-1,732
Covey—
Baker Sand—
Davis Sand—
Barnes Sand—
Carraway Sand—

10 TOPS · FIRST 8

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18131640, documented in the API reference.