WELL · 42-183-30389 · DISTRICT 6

WSGU7 (Horton-Dickson-14T) #14

N

Gregg County · Willow Springs (Cotton Valley) field  · Vertical

Wsgu7 (Horton-Dickson-14t) #14 (API 42-183-30389) is a well in Gregg County operated by EP Operating Company, completed February 4, 1978.

The RRC has issued 2 drilling permits between 1977 and 2002, permitted to 10,510 ft.

It was permitted by Xto Energy Inc. and has since transferred to EP Operating Company on the wellbore schedule.

Completion filings report 5 formation tops, including Glen Rose, Massive Anhydrite (marker), Pettit, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

EP Operating Company

Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Jan 5, 1993 · 568 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEP Operating Company
Production reportsXTO Energy Inc.through Sep 2013
Latest permitXTO Energy Inc.Sep 11, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,510
total depth, ft
2
permits on file
Sep 11, 2002
last permit issued
Feb 4, 1978
completed
0
cumulative oil, bbl
912K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 4, 1978
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
WSGU7 (Horton-Dickson -14C) G-6-92527Willow Springs (Travis Peak)Faulconer Energy, LLC10912KJan 1993 – Jul 2026
— G-6-75471——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EP Operating Limited PartnershipJan 1993 → Feb 1995
  2. 2Enserch Exploration, IncMar 1995 → Mar 1998
  3. 3Eex CorporationApr 1998 → Apr 1998
  4. 4Cross Timbers Operating CompanyMay 1998 → May 2001
  5. 5XTO Energy Inc.Jun 2001 → Sep 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
523528-99RecompletionXTO Energy Inc.Sep 9, 2002Sep 11, 2002Sep 5, 200210,510
13996-99DrillEnserch Exploration, IncDec 14, 1977Dec 14, 1977Nov 14, 197710,510

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-75471————
—— G-6-92527————

Formation tops

As filed on W-2/G-1. Subsea from 246 ft elevation.Download CSV →

FormationMD ftSubsea
Glen RoseUPPER GLENROSE4,856-4,610
Massive Anhydrite (marker)MASSIVE ANHYDRITE6,188-5,942
Pettit7,106-6,860
Travis Peak7,304-7,058
Cotton Valley8,893-8,647

Perforations

Perforated and open-hole intervals.

FromToType
7,3447,552Perforated
8,3758,543Perforated
8,6199,409Perforated
9,5809,890Perforated
10,27810,450Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,25912.25800 S
8.6251,259——
8.6251,26012.25800 S
2.3757,302——
4.510,5107.8751,590 S
4.510,510——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 25, 2002Oct 28, 2002—
00Apr 13, 1993Mar 5, 1993—
00Nov 6, 1992Aug 24, 1992—
00Jan 12, 1984Feb 18, 1981—
00Jan 12, 1984Mar 3, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18330389, documented in the API reference.